SlideServe
Menu
Preferences
© SlideServe · v2026

Design of a Sample Holder for Enhanced X-Ray Fluorescence Scanning of Brain Slices

cheyenne-frazier avatar
10 slides · 245 Views · Nov 20, 2014

This project aims to develop a specialized sample holder that enhances the resolution and accuracy of the rapid scanning x-ray fluorescence technique for brain slice analysis. Key challenges include preventing sample sliding during extended periods (at least 6 hours), accommodating varying sample dimensions, ensuring samples are transport-ready, and facilitating easy loading and cleaning. The design prioritizes metal-free components, compatibility with existing stages, and adheres to a defined budget. Deliverables include a prototype, procedure documentation, a written report, and engineering drawings.

Design of a Sample Holder for Enhanced X-Ray Fluorescence Scanning of Brain Slices - slide 1
01 / 10Design of a Sample Holder for Enhanced X-Ray Fluorescence Scanning of Brain Slices
1 / 17

Download Presentation

Design of a Sample Holder for Enhanced X-Ray Fluorescence Scanning of Brain Slices
An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

More Related Content

Presentation Transcript
  1. Brain Slice Sample Holder Group 7 Jordan Moi Joshua Erikson Ho Nam Chan

  2. Client Dr. Helen Nichol • Associate Professor • Department of Anatomy and Cell Biology • University of Saskatchewan

  3. Problem • Sliding • Photons are absorbed and Scattered • Time Consuming • Potential Bio-Hazard • Not Professional

  4. Objective • To design a sample holder that will improve the resolution and accuracy of the rapid scanning x-ray fluorescence technique.

  5. Constraints • Sample must be mounted vertically for at least 6 hours without sliding. • Contain samples of varying dimensions. • Sample must be ready for scanning before it is packed for transportation. • Easy and fast to load and clean. • All components must be metal free. • Compatible with existing stages. • Budget.

  6. Project Schedule

  7. Deliverables • Prototype • Procedure • Written Report • Engineering Drawings

  8. Questions?

  9. Extras • Average brain slice mass: 150g (based on 1.0cm thickness)

  10. Pictures