1 / 22

The Gambia: Low-Carbon high resilience infrastructure for sustainable development

The Gambia: Low-Carbon high resilience infrastructure for sustainable development Ms. Fatou Ndey Gaye Minister of Forestry and the Environment, . Challenges. one of the most vulnerable countries in Africa to the adverse impacts of climate change ,

cheung
Download Presentation

The Gambia: Low-Carbon high resilience infrastructure for sustainable development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Gambia: Low-Carbon high resilience infrastructure for sustainable development Ms. Fatou Ndey Gaye Minister of Forestry and the Environment,

  2. Challenges • one of the most vulnerable countries in Africa to the adverse impacts of climate change , • Approximately 50% of the total land area is less than 20m above sea level, • One Third (1/3) of the country is below 10m above mean sea level and about 20% is annually flooded • Mangrove ecosystems are affected by saline intrusion as well as flooding

  3. Challenges • Erratic rainfall patterns impact on freshwater reserves and increased evaporation affects groundwater replenishment, • Government is obliged to repeatedly commit limited resources to rebuilding vital infrastructure for transport, energy, education, and sanitation and health services • The capital city Banjul is under severe threat from coastal erosion and sea level rise

  4. Impact of Sea Level Rise in Banjul

  5. Impact of coastal erosion on infrastructures

  6. Impact of coastal erosion on infrastructures

  7. Impact of coastal erosion on coastal communities

  8. Polices and Measures in addressing adverse Impacts on Climate Change • The establishment of the National Climate Committee in 1992. • First National Communication to the UNFCCC (NCC/FNC, 2003), • National Adaptation Programme of Action (NCC/NAPA, 2007), • The Gambia Environmental Action Plan II (GEAP, 2010). • The Nationally Appropriate Mitigation Actions (NCC/NAMA, 2011

  9. Polices and Measures in addressing adverse Impacts on Climate Change • The GEAP : • established the legal and regulatory framework for environmental management. • aims to strengthen national capacity to enforce the provisions of the Conventions on Desertification Control, Climate Change etc • The NAMA focuses on mitigation measures for greenhouse gas reductions

  10. Polices and Measures in addressing adverse Impacts on Climate Change • The National Disaster Management Act was also passed in 2008 leading to the establishment of the National Disaster Management Agency

  11. Polices and Measures in addressing adverse Impacts on Climate Change The Poverty Reduction Strategy Paper II (PRSP II 2007-2011) was factored into the National Adaptation Programme of Action (NAPA). The successor to PRSP II, the Programme for Accelerated Growth and Employment (2011-2015) integrated climate change in the development strategies

  12. Polices and Measures in addressing adverse Impacts on Climate Change The PAGE covers strategies to: • Improve and modernize infrastructure (Pillar 2) • Improve access to social services (Pillar 3) in relation to climate change adaptation • Pillar 5 focuses on the environment and Climate change and strives to ensure that priorities are factored into development policies and programmes through the NAPA

  13. Major efforts at addressing adverse impacts of climate change • Adaptation to Climate Change – Responding to Coastline Change in its human dimension in West Africa through Integrated Coastal Area Management (Regional: UNDP – GEF) • Adaptation of Ecosystem Approach for Integrated Implementation of MEAs at National and Divisional Level Project (UNDP – GEF 2008 – 2012). • Demonstrating and Capturing Best Practices and Technologies for the Reduction of Land –sourced Impacts Resulting from Coastal Tourism Project ( Regional ( UNEP & UNIDO – GEF)

  14. Major efforts at addressing adverse impacts of climate change Strengthening of the Gambia’s Climate Change Early Warning Systems (UNEP – GEF) Enhancing Resilience of coastal and vulnerable communities( UNDP-GEF

  15. Proposed projects • Climate proofing development using infrastructure construction - Longer term policy program, and projects : • building design & coding, urban planning, housing, transport infrastructure) • Increasing the resilience of communities against natural disasters – • disaster preparedness (forecasting logistics of evacuation • post disaster recovery (reconstruction and rehabilitation

  16. Proposed projects • Theme 1: Water, Sanitation and Agriculture (Irrigation systems, Water supply and sewage, Food Storage) • Theme 2: Public works (Roads and bridges in rural areas, Coastal zone protection, Renewable energy facilities) • Projects: • Public works Climate proofing of public and commercial buildings in Banjul • Improved road infrastructures and transport services • Promotion of Labour Based Technologies in Public works • Climate Change Resilient Power Generation and Energy Efficient Technologies for Peri-urban and rural Gambia

  17. Proposed projects • Improved road infrastructure and transport services: • Integration of land use and long term transport needs • Establishment of road hierarchy, demarcation of intersections priorities and identification of roads, pedestrians etc • Conduct a study for the development of a drainage master plan for the greater Banjul Areas • Implementation of Banjul Drainage Master plan • Introduction of road safety audits procedures for urban road improvement • •

  18. Proposed projects • Implementation of Heavy Vehicle Management Programme • Assessment of present level of public transport services and deficiencies and define short and long term transport routes and develop a model for competitive franchises • Study of inter-urban road transport services, define key issues • Development of an improved vehicle testing system

  19. Proposed projects 2. Address infrastructural deficiencies at the identified Disaster Hotspots • Address the 7 hot spots highlighted in the last DRR survey in Banjul, WCR, BARRA, BANSANG, SOMA and BASSE. • Construction of drainages in the seven regional head quarters. • Dredging of Banjul canal

  20. Way forward • Roles and responsibilities of each stakeholder • Implementation of activities • Funding mechanisms • Mechanism for coordination and monitoring and evaluation

  21. Sene-gambia coastal road

  22. Thank you

More Related