1 / 24

China: Water Management and Accounting Project May 22-24, 2006 Hague

China: Water Management and Accounting Project May 22-24, 2006 Hague. Contents Part 1. Water management status in China Part 2. Cooperation project related to SEEAW (as planed) Part 3. Integrated water management based on water accounts (as planed). Part 1.

Download Presentation

China: Water Management and Accounting Project May 22-24, 2006 Hague

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. China: Water Management and Accounting Project • May 22-24, 2006 • Hague

  2. Contents • Part 1. Water management status in China • Part 2. Cooperation project related to SEEAW (as planed) • Part 3.Integrated water management based on water accounts (as planed)

  3. Part 1. Water Management Status in China A. Water related problems B. Water policy and practice

  4. A. Water related problems • a) uneven distribution of water resources • b) water shortage aggravates • c) serious flood damage • d) serious water pollution • e) problems related to water ecology and environment

  5. a) Water resources uneven distribution Average rainfall in the north 50-800mm uneven distribution in space North: water resources 19% population 47% cultivated land 64% GDP 45% South: water resources81% population53% cultivated land 35% GDP 55% Average rainfall in the south 800-2000mm

  6. Unit:m3 7800 28% b) water shortage, conflict between water demand and supply worsen alarming level

  7. c) flood control capacity is fairly low, flood damage is serious - high flood risk - severe burden on flood control - serious damage - national average losses since 1990 was 110 billion yuan

  8. d) serious water pollution intensifies water shortage ● construction of wastewater treatment infrastructure is lagging behind ● pricing mechanism of urban and industrial wastewater treatment is far from perfect ●grave water pollution problem.

  9. B. Water policy and practice • In recent years, guided by the concept of sustainable water management, China has established series of water policies and achieved new progress.

  10. Investment (billion yuan) Population with access to drinking water (million) 3.4 2.8 20.46 16.37 1.7 9.77 0.6 3.86 a) Drinking water safety is priority - More than 20 billion Yuan has been invested in past 5 years - 60 million rural population gain access to drinking water - Provide drinking water to another 100 million rural residents by 2010

  11. b) Develop a water saving society • promote reform on water management system • complete water quantity allocation for major rivers & lakes by 2010 • enact water-abstract permission system • encourage water user participation • promote technology upgrading & products application Water supply project

  12. c) accelerate construction of flood-control and disaster-mitigation system to ensure flood control security - make room for flood - combine structural measures with non-structural measures - invested into comprehensive flood control system reclaimed farmland retreated to lake 2900km2 water surface restored

  13. d) emphasize food security and improve supporting and protecting systems for agriculture - save agricultural water - secure agricultural water use - realize zero-increase of total water use

  14. e) Accelerate construction of water allocation projects to enhance regulation on temporal and spatial distribution of water • plan and build south-to-north water diversion project√construct regional water allocation projects√ increase of water supply √relieve ecological deterioration

  15. urban wastewater treatment rate above 60% water quality of functioning zone in major water body above 65% quality of water sources for urban water supply 95% f) strengthen water pollution prevention to restrain further deterioration of water environment - About 15,000 enterprises were closed due to high water consumption and pollution discharge - Formulating water functioning zone management system by 2010

  16. h) Improve Water management system and mechanism • establishment and implementation ofcorresponding regulations, policies and technical standards • establishment of water management system based on river basin management & administrative district management • promotion of urban and rural integrated water management • encourage private capital in water market construction and operation.

  17. Part 2. Cooperation project related to SEEAW (as planed) • Cooperation form • Accounting contents • Working stages

  18. Cooperation form • Collaborator: • MWR: Data source • NBS: National Accounting Background • Supporter: • UNSD: Implementation of SEEAW

  19. B. Accounting contents • Physical accounts • Flow: SUT, emission accounts • Stock: asset accounts, quality accounts • Monetary accounts • Protect expenditure

  20. C. Working stages • Staff training • Data collection (statistics and surveys) • River basin trial • Implementation at national level

  21. Part 3. • Integrated water management based on water accounts (as planed) • Indicators • Implementation

  22. Indicators Selection • Proportion of people with safe drinking water • Water allocation by sectors • Water use efficiency • Investment of infrastructure • Pricing/cost recovery • Water quality

  23. B. Implementation • Water resources planning for IWRM • Promotion of water-saving • Promotion of water-environment protection • Collaboration among agencies • Establishment of adaptable and standard methodology facing China’s water and economic situation

  24. Thank you