1 / 12

STAR upgrades and expectations for TPC performance.

STAR upgrades and expectations for TPC performance. Flemming Videbaek Outline: STAR upgrades Run Conditions in out years. The STAR Detector - 2  Coverage at Midrapidity. FHC. Upgrades & Status. ToF Barrel – 65% installed; Complete installation by Summer 2009; 2 p -1< h <1

chelseyz
Download Presentation

STAR upgrades and expectations for TPC performance.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STAR upgrades and expectations for TPC performance. Flemming Videbaek Outline: STAR upgrades Run Conditions in out years TPC review BNL

  2. The STAR Detector - 2 Coverage at Midrapidity FHC

  3. Upgrades & Status • ToF Barrel – 65% installed; Complete installation by Summer 2009; 2p -1<h<1 • Extend PID to ~3 GeV/c pp, AA • Forward Gem Tracker (FGT) • pp 500 GeV W program • In construction installation by summer 2011 • Heavy Flavour Tracker • CD-0 approved; CDR in prep; PED and construction FY10 • Fully installed in FY13 for run-14; prototype for run-12 • Min bias Au-Au and pp 200 GeV TPC review BNL

  4. Upgrades in proposal or pre-proposal stage • Muon Tracking Chamber • Outside Magnet. Muon detection 56% of 2p • Physics: J/psi,Ypsilon, e-m • Requires TPC (low rate) • Forward Hadron Calorimeter (FHC) • pp 200 (500) forward jet. • Forward triggered – forward jet- mid-rapidity p0,jet • High Level trigger (HLT) • Fast tracking and event selection (may result in higher TPC rates since it will reject events). • J/psi, di-leptons.. • GMT • Continuous and distortions by match to tracking. • Situated in ToF trays TPC review BNL

  5. RHIC Summary projections (2008) • ‘07 store <L> : 12×1026cm-2s-1for Au-Au at 200 GeV • ‘13 projected : 40×1026cm-2s-1 [stochastic Cooling, b*] • ‘07 store <L> : 2.3×1031cm-2s-1 for p-p at 200 GeV, • ‘13 projected 8.2×1031cm-2s-1 [b*,I/b] • 500 GeV is factor 2.5 higher (scales by g) both with 70% polarization; 60% of calendar time in store (100h/week) (presently 50-60 h/week) TPC review BNL

  6. AA program • Significant Min Bias program for HFT • Au-Au in 2-3 years ; 500-1,000 M events - i.e 500 evts/sec for 10 weeks running for multiple years • pp 200 GeV ; large MB data set too. • UU program likely (v2,…) i.e. Min Bias • Low-Energy scans TPC review BNL

  7. pp 500 GeV W program - FGT • The inner pad-rows are essential for tracking in certain eta region • Planned 300pb-1 over 2-3 years (minimum goal) • The electron momentum is high; triggering with calorimeter will result in low trigger rate, and gating grid opening Use inner padrows for tracking TPC review BNL

  8. pp 500/200 GeV DG • Measurement of di-jet in -1<h<2 using EMC + TPC to determine x1,x2; Observable ALL vs. xT • Possible Significant trigger rate – thus TPC. Concurrent with FGT program TPC review BNL

  9. Strawman Schedule -> 2014 • Preliminary schedule up to 2014 exists. • Additional AA and pp program extends past 2014 • E.g HFT AA and pp 200 ~2013-2016 • Overall string STAR program for several years, but not detailed plans yet. TPC review BNL

  10. Conclusion • Significant MB and low-E triggered program for 2011-2017 utilizing the STAR detector with the TPC. • The projected program for the future calls for significant running with both pp and A-A • 300-900 pb-1 500 GeV pp • 600 pb-1 200 GeV pp • Multi year program with Au-Au and U.U at RHIC-II luminosities. • All in all magnitudes larger luminosities than already delivered in the first 10 years of RHIC (1999-2008) TPC review BNL

  11. Au-Au projection TPC review BNL

  12. pp projections TPC review BNL

More Related