1 / 31

Hindcast Skill in the new coupled NCEP Ocean-Atmosphere Model

Hindcast Skill in the new coupled NCEP Ocean-Atmosphere Model. E M C. Suranjana Saha, Wanqiu Wang, Hua-Lu Pan and the NCEP/EMC Climate and Weather Modeling Branch Environmental Modeling Center, NCEP/NWS/NOAA

chava
Download Presentation

Hindcast Skill in the new coupled NCEP Ocean-Atmosphere Model

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hindcast Skill in the new coupled NCEP Ocean-Atmosphere Model E M C Suranjana Saha, Wanqiu Wang, Hua-Lu Pan and the NCEP/EMC Climate and Weather Modeling Branch Environmental Modeling Center, NCEP/NWS/NOAA Special Acknowledgements : Sudhir Nadiga, Jiande Wang, Qin Zhang, Shrinivas Moorthi, Huug van den Dool

  2. Introduction A new global coupled atmosphere-ocean model has recently been developed at NCEP/EMC. Components a) the T62/64-layer version of the current NCEP atmospheric GFS (Global Forecast System) model and b) the 40-level GFDL Modular Ocean Model (version 3) Note: Direct coupling with no flux correction This model will replace the current operational NCEP coupled model (CMP14) for SST prediction in 2004.

  3. Hindcast Skill Assessment • 5-member ensemble over 22 years from 1981-2002 • January and April initial conditions • Other months to follow • 9 month runs • Initial atmospheric states 0000 GMT 19, 20, 21, 22, and 23 for each month • Reanalysis-2 archive • . • Initial ocean states NCEP GODAS (Global Ocean Data Assimilation System) 0000 GMT 21st of each month • Same for all runs • GODAS operational September 2003

  4. Hindcast Skill Assessment (cont) • So far 220 runs have been made • Hindcast skill • Estimated after doing a bias correction for each year • Uses model climatology based on the other years • Anomaly correlation skill score for Nino 3.4 region SST prediction • Skill maps • Global SST • U.S. temperature and precipitation. • Comparisons with CMP14 and CASST

  5. Observed Coupled Red: monthly bias

  6. Composite Warm and Cold Events • Events exceed ERSST variance by • 1.0 SD (warm) • 0.75 SD (cold) • Heavy black line is mean - 36 mo +36 mo Peak

  7. SST Climatology on Equator Red: coupled model

  8. Ensemble Mean CASST CMP14 April IC

  9. CASST Ensemble Mean January IC CMP14

  10. RMS Error April

  11. RMS Error January

  12. Observed 6 Month Lead (November) from April IC SST anomaly for 1981-2002 Note Amplitudes

  13. Observed 6 Month Lead (August) from January IC SST anomaly for 1981-2002 Note Amplitudes

  14. Hindcast Seasonally (3 month) Averaged SST Anomaly Correlation April IC Note: large & persistent skill in tropics

  15. Hindcast Monthly Averaged SST Anomaly Correlation April IC June-September Left: New Coupled System Right: CMP14

  16. Hindcast Monthly Averaged SST Anomaly Correlation April IC October-January Left: New Coupled System Right: CMP14

  17. Hindcast Seasonally (3 month) Averaged SST Anomaly Correlation January IC Note: large & persistent skill in tropics

  18. Hindcast Seasonally Averaged SST Anomaly Correlation January IC Left: New Coupled System Right: CMP14

  19. Hindcast 3 month Averaged U. S. Surface Temperature Anomaly Correlation April IC Note: areas of persistent skill > 60% at up to 6 month lead

  20. U. S. Surface Temperature Hindcast Skill 3 Month Averages April IC Comparison with CPC CCA Method Note: Coupled System skill complementary to CCA

  21. U. S. Surface Temperature Hindcast Skill 3 Month Averages January IC Comparison with CPC CCA Method Note: Coupled System skill complementary to CCA

  22. Hindcast 3 month Averaged U. S. Precipitation Anomaly Correlation April IC Note: areas of persistent skill > 60% at up to 6 month lead

  23. U. S. Precipitation Hindcast Skill 3 Month Averages April IC Comparison with CPC CCA Method Note: Coupled System skill complementary to CCA

  24. U. S. Precipitation Hindcast Skill 3 Month Averages January IC Comparison with CPC CCA Method Note: Coupled System skill complementary to CCA

  25. MJO Forecasts (W. Wang) Experiments • damp: GFS03 with damped SST anomalies • clim: GFS03 with climatological SSTs • amip: GFS03 with observed SSTs • coup: CFS03 with MOM3 ocean analysis All forecasts to 45 days Composite results

  26. (Max pos. ampl. Over WPAC) Phase 3 (Max pos. ampl. Over IO) Phase 2 Phase 4 Phase 1 (Decay) (Initiation)

  27. Days 1-30 Observed SST Expt. Damped Climo AMIP Coupled Note: coupling necessary for propagation in Phases 1-3

  28. Summary and Conclusions • CFS03 hindcast skill for January and April initial conditions (1981-2002 ) have been evaluated • For April, the SST AC skill over Nino 3.4 is better than CMP14 and CASST at all leads • For January, the SST AC skill over Nino-3.4 is better than CMP14 and CASST for all leads, except lead 2

  29. Summary and Conclusions (cont) • Ensemble mean forecasts for U.S. temperature and precipitation show comparable skill to CPC’s CCA method. • This skill is complementary to CCA as it manifests itself in different geographical areas and can be used in CPC’s operational seasonal consolidated forecast. • Hindcasts for the rest of the calendar months are being performed • Implementation is being planned for late 2004

  30. New Climate Positions at NCEP/EMC • UCAR Visiting Scientist Position at NCEP/EMC • Work with NCEP Coupled Model • http://www.earthworks-jobs.com/climate/ucar3101.html • NCEP Climate Team Leader (GS-15) • Coordinate development activities with community • Provide strategic guidance on NCEP’s Climate Numerical Modeling activities • Participate actively in development activities with EMC staff

More Related