ZEEBRUGGE – FACT SHEET. BUILDING AND PREMISSES: (PHASE 1: TBR) 2 KM from port terminal, D type bonded 27,456 m² warehouse 8 modules of 3,500 m² 4 modules with 9m useful height and 4 modules with 8m useful height Parking area is 12,000 m²

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'ZEEBRUGGE – FACT SHEET' - chance


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide4

ZEEBRUGGE – FACT SHEET

  • BUILDING AND PREMISSES:
  • (PHASE 1: TBR)
  • 2 KM from port terminal, D type bonded
  • 27,456 m² warehouse
  • 8 modules of 3,500 m²
  • 4 modules with 9m useful height and 4 modules with 8m useful height
  • Parking area is 12,000 m²
  • Total land concession is 58,950 m² plus an additional 78,796 m²
  • Purchase cost 6,2 million Euro
  • Capacity is 110,000 TBR
  • BUILDING AND PREMISSES:
  • (PHASE 2: PSR & CVR)
  • Attached with phase 1, D type bonded
  • 28,336 m² warehouse
  • 4 modules of 7,000 m²
  • 7000 m² with 11m useful height and 21,000 m² with 8m useful height
  • Parking area is 5,000 m²
  • Construction cost 6,5 million Euro
  • Capacity is 720,000 PSR and 80,000 CVR
slide5

ZEEBRUGGE – FACT SHEET

  • Workforce: (PHASE 1)
  • 18 operators of which 2 are interim, 3.5 administrative staff, 1 manager
  • Total handling capacity is 8.700 TBR tires/shift or 21.36 tons/man/shift
  • Workforce: (PHASE 2)
  • 26 operators, 2.5 administrative staff, 0 manager
  • Total handling capacity is 26.500 PSR tires/shift or 10.7 tons/man/shift
  • Material handling: (PHASE 1)
  • 18 forklift trucks
  • 13.100 TBR leased racks (5 high) – allows a maximum storage of 110.000 tires in the warehouse
  • 15 docks – allows an intake of 15-20 containers per day and 15-20 trucks out per day – total volume is 3.729 containers IN for 2002
  • SAP WM 4.6, with RF (under implementation)
  • Material handling: (PHASE 2)
  • 15 forklift trucks
  • 38.914 racks (9 high PSR, 7 high CVR) – allows a maximum storage of 800.000 tires in the warehouse
  • 14 docks – allows an intake of 12-18 containers per day and 12-18 trucks out per day – total volume is 8.000 containers IN for 2004 (all tires)
  • SAP WM 4.6, with RF
slide7

BUILDING AND PREMISSES

- 2 KM from polt terminal, D type bonded

- Warehouse is 56 000 m² 4 modules of 3500 m², 9 m useful height; 4 modules of 3500 m², 8 m useful height 1 module of 7000 m², 11 m useful height; 3 modules of 7000 m², 8 m useful height

- Parking area is 17 000 m²

- Total land concession is 58 950 m² plus an additional 78 796 m²

- Purchase cost 6.2 million euro (2001), and construction cost 6.5 million euro (2003)

- Capacity: 110 000 TBR; 600 000 PSR/CVR WORKFORCE- 74 operators of which 35 are interim, 7 administrative staff, 2 managers

- Total handling capacity is 8 700 TBR tires/shift or 21.36 tons TBR/man/shift

- Total handling capacity is 26 500 PSR tires/shift or 10.7 tons PSR/man/shift MATERIAL HANDLING- 18 forklift trucks for TBR; 15 forklift trucks for PSR

- 13 100 TBR leased racks (5 high) - allows a maximum storage of 110 000 tires in the warehouse

- 35 000 racks (9 high PSR, 7 high CVR) - allows a maximum storage of 600 000 tires in the warehouse

- TBR part: 15 docks - allows an intake of 15-20 containers per day and 15-20 trucks out per day totally 4753 TBR containers IN for 2003

- PSR part: 14 docks - allows an intake of 12 - 18 containers per day and 12 - 18 trucks out per day totally 1904 PSR containers IN for 2003 (from June)

- SAP WM 4.6 with RF