1 / 33

Taking The Night Away From Charlie

Taking The Night Away From Charlie. SIXTH TRIENNIAL VIETNAM SYMPOSIUM THE VIETNAM CENTER TEXAS TECH UNIVERSITY. QT-2PC Aircraft. Six Sheave 3:1 V-Belt Reduction System. Starlight Scopes. “Skonk Works, North Rules ( with respect to Kelly Johnson ) ‏. Limited Access

Download Presentation

Taking The Night Away From Charlie

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Taking The Night Away From Charlie • SIXTH TRIENNIAL VIETNAM SYMPOSIUM • THE VIETNAM CENTER • TEXAS TECH UNIVERSITY

  2. QT-2PC Aircraft

  3. Six Sheave 3:1 V-Belt Reduction System

  4. Starlight Scopes

  5. “Skonk Works, North Rules(with respect to Kelly Johnson)‏ • Limited Access • Very short Chain Of Command • Direct contact with customer. • Minimum inspection, documentation, and reporting. • Commercial parts and local vendors. • Many usual DoD & Lockheed requirements waived.

  6. Skonk-Works, North

  7. QT-2 1st Flight - August 15, 1967

  8. Prize Crew Operational Evaluation (OpEval) Plan • Add IFR Instrumentation and Comm/Nav Avionics • Add viewing ports for the Tactical Observers • Paint the aircraft for night operations. • Train the aircrews • Deploy the aircraft to Vietnam within 90 days. • Conduct nightly surveillance missions. • Evaluate the quiet aircraft concept and, specifically the Prize Crew Aircraft, in a tactical operational environment.

  9. Up-Loading a QT-2PC into USAF MAC C-130 at NAS Moffett Field, (“Blimp” Hanger in background)‏

  10. Soc Trang Army Airfield, RVN • 3500’ Long • 130’ Wide • Near Sea Level • In the Mekong Delta Near Bassac R. and the South China Sea

  11. Off-Loading the QT-2PC(on its trailer) from the USAF C-130

  12. Uncrating the QT-2PC

  13. Crew Installing Port Wing

  14. Preflight Checkout

  15. Typical Hanger Work 1

  16. Typical Hanger Work 2

  17. QT-2PCs on Ramp (STAF Tower in backgound)‏

  18. Prize Crew OpEval Objectives • Determine which missions and roles can be performed by quiet aircraft and ascertain whether the results justify further development of the concept. • Determine the capabilities and limitations of the quiet aircraft in performing those missions and roles. • Determine the requirements to improve mission performance in a future quiet aircraft. • The plan also included additional objectives beyond the scope of this paper: Development and identification of tactics, organizational structures, resources, and support for quiet aircraft operational deployment.

  19. QT-2PC Range/Endurance

  20. Prize Crew Mission Planning • Two four-hour missions per aircraft each night between sundown and sunrise and within a 70-mile radius of Soc Trang . • Crew change at turn-around. • On-station times approximately half of the mission time. • Half-hour a fuel reserve allowed for unplanned events. • Alternate Airfields: • 1st: Binh Thuy VNAFB • Tertiary: Tan Son Nhut and Binh Hoa

  21. Prize Crew Ops Shack

  22. Air Crew Brief/Debrief

  23. Aircrew Ingress and Buckle-Up

  24. Pre-Flight Check-out

  25. Salute and Take-Off

  26. QT-2PC in Left Turn

  27. QT-2PC Landing After a Mission

  28. Prize Crew Mission Roles • Hot Contact, Pre- and Post- Strike intelligence. • Linear surveillance along routes, trails, roads, tree lines and waterways • Area and perimeter searches around bases, camps, and outposts: Defense and location of enemy attack positions: • Support for: • Artillery • Special Forces and SEALs. • Riverine and Coastal Naval Forces

  29. Prize Crew Sightings % Total Sightings/ Mission Flight % Flight Role Time Sightings Hour River/Canal 35 70 0.9 Route: 15 20 0.62 Area, Coastal, 27.5 12.5 0.26 Perimeter & Strike Enroute/ Training 22.5 --- --- Average 100 --- 0.49

  30. Optimum Moon-Target-Aircraft relationship for target viewing and minimum aircraft detectability

  31. QT-2PC Joint Service Air Crew

  32. QT-2PC Joint Service Ground Crew

  33. 75RR Missed Lucky Trooper

More Related