1 / 4

Vertical Wire Installation Update at Store 6398

The MFW Program at Store 6398 has successfully restarted, capturing all 8 GeV flies on the front end. The MI Vertical wire is vacuum-tested and ready for installation in both orientations. Watch the Beamssrv1 movie for more details.

carson
Download Presentation

Vertical Wire Installation Update at Store 6398

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MIPM and MFW Update 9/3/2008

  2. IPM P-Bar Shot - Store 6398

  3. IPM P-Bar Shot Spec

  4. MFW Update Restarted the MFW Program and all 8 Gev flies seem to be captured on the front end for Store 6398 MI Vertical wire is ready to install. Has been flown under vacuum and in both horizontal and vertical orientations. Short movie on Beamssrv1/inst.bd/instruments/Flying Wires/MFW/2008 Fork Tests/DSCN0533.mov

More Related