40 likes | 125 Views
The MFW Program at Store 6398 has successfully restarted, capturing all 8 GeV flies on the front end. The MI Vertical wire is vacuum-tested and ready for installation in both orientations. Watch the Beamssrv1 movie for more details.
E N D
MIPM and MFW Update 9/3/2008
MFW Update Restarted the MFW Program and all 8 Gev flies seem to be captured on the front end for Store 6398 MI Vertical wire is ready to install. Has been flown under vacuum and in both horizontal and vertical orientations. Short movie on Beamssrv1/inst.bd/instruments/Flying Wires/MFW/2008 Fork Tests/DSCN0533.mov