1 / 12

The Story So Far

The Story So Far. Cold in both rings. 4K Wave. PP12 lattice test evening. PS work during Day. Overnight Stores 109x109. PS gave us e-lens. First Collisions. Start Physics. LIPA Maintenance. 6 hour stores with tune between. LIPA Maintenance. 8hr Stores. APEX. Inject =200e11.

candide
Download Presentation

The Story So Far

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Story So Far Cold in both rings 4K Wave PP12 lattice test evening PS work during Day Overnight Stores 109x109 PS gave us e-lens First Collisions Start Physics

  2. LIPA Maintenance 6 hour stores with tune between LIPA Maintenance 8hr Stores APEX Inject =200e11

  3. Maintenance Switch Fy12 Lattice Pushed Intensity Reach 200e11 At FT Rotator Tuning APEX Maintenance MD Studies Golden Store 17396 APEX Machine Dev.

  4. Past week • Focus on Transverse emittance seems to have paid off • Fix of RF issues in AGS • Understanding of intensity threshold for blow up • Keeping stable tunes at injection • Lower emittance tolerances <10pi at injection • Remove Pol. Measurement at Injection • Also great progress on longitudinal emittance: • Commission of BB damper on ramp • Bunches dropped from 3 to 2.8 nsecs after re-bucketing • We also progress on understanding Spin tune at Store • Effect due to Star bump pushes tune in Yellow 0.475, Blue 0.49 • Took bump out on ramp and at Store but this was reverted in the process of diagnosing emittance blow up on the ramp • Progress on Optics correction at Store fixing beta-beat • Tested in collision at store

  5. Blue Horizontal Emittance compare with FY12

  6. More recent Stores

  7. Blow up during Store

  8. When bunch Intensity > 1.8/bunch

  9. Extra Signal in Spectrum

  10. Not there or weaker previous Fill >1.8/bunch

  11. Moves with tunes

  12. Future Plans • RF reducing Landau at injection slowly and on ramp. Fixing phase issues • Measure spin tune before and after rotator ramp. • Replay ramp without bbq kicker • Path to ease in new optics correction at store • Track down and try and fix our intensity dependent growth on rotator ramp and rebucketing. • Test Yellow e-lens phases at Store

More Related