Monitoring Device for Human Smoking Behavior. System Level Design Review P10054 October 9, 2009. Introductions. Frank Forkl Mechanical Engineer Project Leader Michael Kraft Mechanical Engineer Customer Needs House of Quality Belt Clip Device Rich Steen Mechanical Engineer Risks
Monitoring Device for Human Smoking Behavior
E N D
Presentation Transcript
Monitoring Device for Human Smoking Behavior System Level Design Review P10054 October 9, 2009
Introductions • Frank Forkl • Mechanical Engineer • Project Leader • Michael Kraft • Mechanical Engineer • Customer Needs • House of Quality • Belt Clip Device • Rich Steen • Mechanical Engineer • Risks • Mechanical/Electrical Interface • Brian Gilbane • Mechanical Engineer • Engineering Specs • DIP and flow analysis • Derek Ng • Electrical Engineer • System Block Diagram • Electrical Components • Sensors
Project Description This project involves the development of a device that will unobtrusively capture data on each draw on a cigarette and the deep inhalation puff. Our device is designed to accurately acquire and store real human inhalation behavior during a smoking event.
System Level Design ReviewAgenda • Customer Needs • Engineering Specifications • House of Quality • Concept Generation • Concept Selection • Risks • System Block Diagram • Project Plan • Discussion
Customer Needs Customer Needs on EDGE
Engineering Specifications Engineering Specifications on EDGE
House of Quality House of Quality on EDGE
Brainstorming and Concept Selection Concept Selection Node on EDGE
Risks Risk Analysis on EDGE
System Block Diagram System Block Diagram on EDGE
Project Plan Project Schedule on EDGE