An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safe Roads, Reliable Journeys, Informed Travellers Asset Management Performance (Structures) Bridge Owners Forum – Leeds -14 June 2005 Awtar Jandu

  2. Safe Roads, Reliable Journeys, Informed Travellers The following areas will be covered in this presentation: • Research during 2004/2005 • New procedures for Research proposals • Value Management Workshops • Research proposal for 2005/2006 and beyond

  3. Research Projects 2004/05 • Separation of cyclist and Pedestrians from motor traffic- Report awaited • User tolerances to vibrations on footbridges- Work completed –Report awaited • Scoping study Timber Bridges –Work completed- Report awaited • Waterproofing of decks- Stiffness of membrane/ thin surfacing –Completion 03/06 • Waterproofing of decks – Early application – Completion 03/06 • ATM gantries – High -sided vehicle buffeting effects – Completion 09/05 • Durability of hinge-decks – Draft of BA to be circulated shortly

  4. Research Projects 2004/05 • Fire protection of tunnel assets- Second draft being considered • Implications of EU Directive on tunnels- Report is finalised • Fire detection and suppression in road tunnels- Draft final report received • Innovations in Road Tunnels- Report finalised – Review recommendations. • Performance Indicators for highway structures – Trial Documents available • Trial use of recycled aggregates in structural concrete- Seminar held- Draft BA in progress

  5. Research Projects 2004/05 • Crevice corrosion investigation in post-tensioned structures- Research findings being considered by HA • Footbridge dynamic response properties – Final report in Autumn ’05 • WIM systems and braking forces for abnormal loads- Work completed • The effectiveness of sub-standard shear reinforcement in bridge decks – Phase 1 • Tests on RC beams strengthened for shear using FRP laminates – Third Report • Behaviour of RC beams strengthened for flexure - FRP laminates – 4th Report • Performance assessment of FRP bridge decks: Testing of deck sections under static and dynamic loading – Phase 3 Report

  6. Research Projects 2004/05 • Near surface mounted FRP for bridge strengthening • Fire detection and suppression in road tunnels • Acoustic emission for hinge decks • Fire protection of tunnel assets • Effective post- incident recovery in highway tunnels • Primary safety for tunnel users • Design guidance for non-ferrous rebar

  7. Research Projects 2004/05 • Tunnel emergencies:emergency evacuation • Expansion joints for integral bridges • Use of mechanical ventilation in tunnel emergencies • Effectiveness of washing bridges

  8. Research Value Management Workshops

  9. Value Management Workshops: Development of the R&D Programme: • New proposals received (Oct 04) • Bids collated and evaluated • Proposed projects prioritised • Programme matched to available resources • Draft programme to HA Board (Jan 05) • Submission to the Minister (Feb 04) • Approval by the Minister (April 05)

  10. Value Management Workshops: HA Research Themes: • Accessibility • Asset Use • Driver information • Improved safety • Integration • Reducing congestion • Sustainability

  11. Value Management Workshops: The Essential Criteria: • Benefits must be clearly identified • Proposals must be feasible/achievable • Proposals in line with HA objectives

  12. Value Management Workshops: Criteria used for 2005/06: • Improving safety • Reducing congestion • Reducing environmental impact • Enhancing driver information • Optimising WLC • More effective technical governance • Speeding up delivery • Developing Traffic Operator role • Wider benefits

  13. Value Management Workshops: Scoring: • Benefits Score of 0 – None benefits Score of 10 – Exceptional benefits • Likelihood – Score (0 - 10)

  14. Research Value Management Workshops Proposed Research Projects for 2005/06

  15. Proposed New Projects 2005/06 • Early application of waterproofing systems to bridge decks • Impact of revised HSE Standards on tunnels • Assessment rule s for web stiffeners in steel bridges • Half- joint bridge testing • Temperature effects on integral bridges • Design and strengthening of bridges for vehicle impact (desk study) • Assessing defect acceptance in FRP materials • Steel fibre-reinforced concrete – Concrete Society Report