ASSET MANAGEMENT. CITY OF MONASH PARKS. CITY OF MONASH PARKS. Strategic asset management plans Other asset plans and programs Challenges. ASSET MANAGEMENT PARK PLANS. Paths Playgrounds Sportsfield playing surfaces Public lighting Off-street car parks Drainage & retarding basins.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'ASSET MANAGEMENT' - dessa


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
asset management

ASSET MANAGEMENT

CITY OF MONASH PARKS

city of monash parks
CITY OF MONASH PARKS
  • Strategic asset management plans
  • Other asset plans and programs
  • Challenges
asset management park plans
ASSET MANAGEMENT PARK PLANS
  • Paths
  • Playgrounds
  • Sportsfield playing surfaces
  • Public lighting
  • Off-street car parks
  • Drainage & retarding basins
plans paths
PLANS-PATHS
  • Sealed paths
  • Unsealed paths
    • Locations
    • Proactive maintenance
    • Reactive maintenance
  • Budgets
paths proactive maintenance
PATHS-PROACTIVE MAINTENANCE

Priority- H inspect yearly – M every 3 years – L every 5 years

paths proactive maintenance1
PATHS-PROACTIVE MAINTENANCE
  • Total area unsealed paths -56,000²
    • Gravel/toppings 45,300²
    • Scalping 6,700²
    • Mulch 4,000²
  • Budget $73,000
  • Unsealed sealed
paths reactive maintenance
PATHS-REACTIVE MAINTENANCE
  • Response times
  • Budget $37,000
playgrounds proactive
PLAYGROUNDSPROACTIVE

Inspection Regime

Aligned with AS/NZS 4486.1

  • Weekly or fortnightly
    • Dependant on usage
    • Predominately a visual inspection & minor maintenance
      • i.e. Graffiti, rubbish, rake softfall, small repairs
    • HP iPaq to capture details
    • Budget $58,000
  • Annual
    • Structural, entrapments
playgrounds proactive1
PLAYGROUNDSPROACTIVE
  • Softfall
    • Aim to maintain minimum 200mm depth
    • Weekly/fortnightly check with visual audit
    • Biannual depth audit
    • Supply and spread contract
    • Budget $136,000
playgrounds reactive
PLAYGROUNDSREACTIVE
  • Responsiveness
    • Normally and inspection on the day
    • Make safe
    • 1 to 20 days to repair
playgrounds
PLAYGROUNDS
  • 131 Playgrounds in parks
  • Area 28,400²
  • Budget
    • Inspections $58,000
    • Routine works $138,000
    • Reactive works $58,000 excluding insurance claims
    • Capital Works $439,000 (2013/14)
sportsfield playing surfaces
SPORTSFIELD PLAYING SURFACES
  • Audits
  • Maintenance programs
  • Capital improvements
  • Irrigation systems
  • Cricket wickets
  • Goal posts
sportsfields audits
SPORTSFIELDSAUDITS
  • Change of sporting seasons
  • Audits include
    • Turf density and vigour
    • Percentage of preferred grass
    • Drainage
    • Unevenness
    • Weed cover
    • Number of bare areas
    • Irrigation
    • Goal posts
sportsfields maintenance
SPORTSFIELDSMAINTENANCE
  • Programs
    • Mowing
    • Aerating
    • Rolling
    • Pest control
    • Fertilisers
    • Goal posts
    • Cricket wicket, turf/synthetic
sportsfields maintenance1
SPORTSFIELDSMAINTENANCE
  • Task frequencies influences
    • Grass species
    • Soil profile
    • Drainage characteristics
    • Usage
    • Seasonal factors
    • Damage / wear
sportsfields maintenance3
SPORTSFIELDS MAINTENANCE
  • 66 sportsfields
  • Budget $825,000
sportsfields maintenance4
SPORTSFIELDSMAINTENANCE
  • Irrigation systems
    • Audits
    • Maintenance and repair contract
    • Reactive maintenance
    • Budget Operational $100,000
sportsfields capital works
SPORTSFIELDSCAPITAL WORKS
  • Approach
    • Whole of site where feasible
    • Linked to sportsfield audits
    • User concerns
    • Budget - $130,000 (2013/14)
public lighting
PUBLIC LIGHTING
  • 467 light towers
  • Audits on a 5 year cycle
  • Commenced with timber / known trouble spots
  • Audit includes
    • Visual inspection
    • Record of pole attributes
    • Structural of footings and columns
    • General observations
    • Identify the most cost effective means of repairing any defects
  • 65 light towers audited during stage 1
  • Remedial cost $24,000
other plans programs
OTHER PLANS & PROGRAMS
  • Parks maintenance
  • Tree maintenance
  • Bushland reserves
  • Water features
  • Golf Courses
  • Shade sails
  • Basketball/netball rings
park maintenance
PARK MAINTENANCE
  • Routine Service
trees1
TREES
  • Tree inventory
  • Management plan
  • Reactive works
  • Programmed works
trees works
TREES WORKS
  • Cyclic -100,000 trees, over $1.38 million p.a.
tree works
TREE WORKS
  • Reactive - $760,000
  • Reserve audits
    • Frequency 12-18 months
    • Scope
  • Planting and establishment
    • Over 70,000 plants annually - $490,000
    • Establishment - $115,000
bushland
BUSHLAND
  • Maintenance programs
  • Fire management
    • Management plan
    • MFB inspections
    • Vegetation clearance
    • Fire patrols
  • Total Budget - $750,000
bushland1
BUSHLAND
  • Protecting our natural Heritage assets
    • Weed control and sympathetic mowing
    • Access control
    • Seed collection and propagating
    • Pest control
    • Habitat management
wetlands
WETLANDS
  • Assessments
  • Sediment / excessive vegetation removal
  • Improved function
  • Capital budget 2013/14 - $170,000
golf courses
GOLF COURSES
  • Greens replacement program
  • Irrigation improvements
  • Storm water harvesting
  • Warm season grass conversion
shade sails
SHADE SAILS
  • 18 sites in reserves
  • Engineers audits over a 2/ 3 year period
  • Includes detailed report, photos, recommendations and approx. costs
  • Works priority (critical / non critical)
  • Reports gave time frame requirements (critical, short, medium, long term)
  • 9 reserves audited in stage 1
    • Three for replacement (approx. $50,000)
    • $30,000 in maintenance requirements.
basketball netball rings
BASKETBALL &NETBALL RINGS
  • 92 Basketball / netball rings
  • Cost for audit $10,000
  • Audits to occur every three years
  • Audits include load testing, full report with photos, recommendations and costs
  • $6,000 for initial maintenance costs (this included replacing 5 backboards)
challenges
CHALLENGES
  • Resources
  • Availability of equipment
  • Renewal gap
  • Clear responsibilities / training
  • Audit outcomes and repair costs
  • Operational pressures i.e. Frequent repairs
  • Reduce responsive works
  • New assets/maintenance costs
  • External pressures