1 / 10

INTEGRAL Guest Observer Facility

INTEGRAL Guest Observer Facility. Successful Launch 10/17/02, desired 3-day elliptical orbit achieved Primary instruments performing nominally SPI Ge detector resolution up to spec Problems: JEM-X anode failures, gain voltage lowered (cut off at ~4.5 keV)

brownapril
Download Presentation

INTEGRAL Guest Observer Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTEGRAL Guest Observer Facility • Successful Launch 10/17/02, desired 3-day elliptical orbit achieved • Primary instruments performing nominally • SPI Ge detector resolution up to spec • Problems: • JEM-X anode failures, gain voltage lowered (cut off at ~4.5 keV) • 1 telescope in use (~50% of pre-launch efficiency) • High background rates for SPI, IBIS • some event-data modes not always available Mission, Overview, Status:

  2. INTEGRAL Guest Observer Facility • PV phase completed, AO-1 program started 12/27/02 • NRA grant support for US PIs/Co-Is • 45 proposals received; $1.7M total requests • Peer reviewed last spring, $1.4M allocated (w/caveats) • 1st US observation last week (4U 1630-47) • 23 US PIs out of 105 total • AO-2 release planned for mid-July 03 • proposals due September Mission Status (con.)

  3. INTEGRAL Guest Observer Facility PV Phase: Cygnus Region

  4. INTEGRAL Guest Observer Facility Cygnus Region

  5. INTEGRAL Guest Observer Facility PV Phase Results: (XSPEC-12)

  6. INTEGRAL Guest Observer Facility Gamma-Ray Bursts: GRB 21125 Localized INTEGRAL is capable of localizing ~10-20 GRBs per year to ~10 arc min (prompt) accuracy. In Addition, the SPI anti-coincidence system can provide information to the Inter Planetary Network for triangulation.

  7. INTEGRAL Guest Observer Facility • 1H n-capture line clearly resolved, 16 keV @2216 keV • SPI resolution seems up to spec, R~500 except for detector 15 Solar Proton Flare

  8. INTEGRAL Guest Observer Facility • Public data archive to be mirrored at HEASARC • large data volumes, ~2.5-3 Gb/day (volume already exceeds CGRO!) • PV database now installed at GSFC as test (not publicly available) • Procurement initiated for physical archive through ~FY05 • Combined XMM+Swift+INTEGRAL anticipated 2.5Tb/year • Automated data transfer under study • data volumes pose difficulties • PV DB ~125 Gb, via network transfer (painful…) • Archive interface under development • Some -ray friendly enhancements desirable Database Issues:

  9. INTEGRAL Guest Observer Facility Software Issues • ISDC plans first public release in March 03 • Port to linux accomplished • GSFC is testing & development site • Successful end-to-end analyses carried out. Some issues: • Coded mask instrument concepts unfamiliar to many • first time users face steep learning curve • Analysis executables are “ftool-like”, but subtle difficulties • Analysis scripts are preferred approach, but can mask underlying complexities • Performance • Large DB volume & distribution over 100’s of files limits performance

  10. INTEGRAL Guest Observer Facility • Analysis system uses “object”& “grouping” concepts • data distributed over numerous files & directories, managed by FITS (“observation group” and “science window group”) tables • this renders use of familiar techniques for data inspection, screening (e.g. FV, fselect) difficult • Some ISDC standard keyword (such as extension names) require modifications to FTOOLs • Extensive use of type-II PHA files • Not supported by some FTOOLS such as grppha, mathpha • Also INTEGRAL-specific rmf & arf files (for SPI) Software Issues: Interoperability

More Related