Results-Based System

Results-Based System. A. M. Farahat. Results-Based System. Is a tool which integrates planning, management, evaluation and reporting into one logically interconnected framework focusing on RESULTS. Results Chain.

brooks
Download Presentation

Results-Based System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Results-Based System A. M. Farahat INP / A.M. FARAHAT

  2. Results-Based System • Is a tool which integrates planning, management, evaluation and reporting into one logically interconnected framework focusing on RESULTS INP / A.M. FARAHAT

  3. Results Chain The causal sequence beginning with inputs through activities, outputs and culminating in outcomes and impact INP / A.M. FARAHAT

  4. Results • Impact, Outcomes and Outputs are: RESULTS • Inputs and activities are : PROCESSES INP / A.M. FARAHAT

  5. Results • Impact Long-term result (> 5years) • Outcome Medium-term result (3-5 years) • Output Short-term result (1-2 years) INP / A.M. FARAHAT

  6. Results Results have to be (SMART) namely: • Specific • Measurable • Achievable • Relevant and, • Time-bound INP / A.M. FARAHAT

  7. Results Chain Impact Outcome Output Activities Inputs • Top-Down : Planning • Bottom-Up : Implementation INP / A.M. FARAHAT

  8. Rationale • Focus on results rather than processes • Learning continuously and adjusting during managing and implementation rather than learning after the fact • Soup example INP / A.M. FARAHAT

  9. Tools • Planning Tools • Monitoring and Reporting Tools INP / A.M. FARAHAT

  10. Tools • Planning Tools • The Results Chain (RC) • The Log Frame (LF) • The Performance Measurement Framework (PMF) • Work Breakdown Structure (WBS) • Work Schedule • Work Budget INP / A.M. FARAHAT

  11. Tools • Planning Tools • The Results Chain (RC) • Pages 4 or 13 of the toolkit • The Log Frame (LF) • The Performance Measurement Framework (PMF) • Work Breakdown Structure (WBS) • Work Schedule • Work Budget INP / A.M. FARAHAT

  12. Tools • Planning Tools • The Results Chain (RC) • The Log Frame (LF) • Introducing Performance Indicators and risks/challenges against results • Page 15 of the toolkit • The Performance Measurement Framework (PMF) • Work Breakdown Structure (WBS) • Work Schedule • Work Budget INP / A.M. FARAHAT

  13. Tools • Planning Tools • The Results Chain (RC) • The Log Frame (LF) • The Performance Measurement Framework (PMF) • Introducing attributes to the Performance Indicators • Pages 16 & 25 of the Toolkit • Work Breakdown Structure (WBS) • Work Schedule • Work Budget INP / A.M. FARAHAT

  14. Tools • Planning Tools • The Results Chain (RC) • The Log Frame (LF) • The Performance Measurement Framework (PMF) • Work Breakdown Structure (WBS) • Introducing Activities ( and may be Tasks also) • Page 26 of the Toolkit • Work Schedule • Work Budget INP / A.M. FARAHAT

  15. Tools • Planning Tools • The Results Chain (RC) • The Log Frame (LF) • The Performance Measurement Framework (PMF) • Work Breakdown Structure (WBS) • Work Schedule • Introducing Gantt chart against activities • Page 37 of the Toolkit • Work Budget INP / A.M. FARAHAT

  16. Tools • Planning Tools • The Results Chain (RC) • The Log Frame (LF) • The Performance Measurement Framework (PMF) • Work Breakdown Structure (WBS) • Work Schedule • Work Budget • Could be combined with the schedule • Page 41 of the Toolkit INP / A.M. FARAHAT

  17. Tools • Monitoring and Reporting Tools • Background info • Context • Planned vs. actual achievements • Page 53 of the toolkit • Planned vs. actual expenditure • Page 56 of the Toolkit • Challenges met and constraints • Page 59 of the Toolkit • Lessons learnt INP / A.M. FARAHAT