EVLA Correlator CoDR. P. Napier Overall EVLA Project Plan. EVLA Project Status. Project currently funded by NSF for planning work. Expect construction approval by National Science Board on 14 Nov., 2001. Funding expected at $ 5+ M/yr.

1 / 4

Download Presentation

EVLA Correlator CoDR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EVLA Correlator CoDR P. Napier Overall EVLA Project Plan EVLA Correlator CoDR Nov 2, 2001.

  2. EVLA Project Status • Project currently funded by NSF for planning work. • Expect construction approval by National Science Board on 14 Nov., 2001. Funding expected at $ 5+ M/yr. • All areas of the project currently in requirements definition, design and prototyping phase. Transition phase compatibility a significant design driver. • Key requirement for this correlator review is to ensure that the requirements are complete and understood. EVLA Correlator CoDR Nov 2, 2001.

  3. EVLA Schedule • Install prototype EVLA system on EVLA Test Antenna(s) Q2 2003 • Start EVLA electronics production Q4 2003 • Start retrofitting 7 antennas/year with new electronics system Q2 2004 • Test of prototype correlator on 3 or 4 antennas Q4 2005 • Start outfitting new correlator room Q2 2006 • Start tests of first correlator subset at VLA Q4 2006 • First “shared-risk” science with new correlator subset Q2 2007 • Last antenna retrofitted to EVLA design Q1 2008 • New correlator declared “operational” Q1 2009 • Last EVLA receiver installed Q1 2010 EVLA Correlator CoDR Nov 2, 2001.

  4. Correlator CoDR Review Committee • Reviewers External to the EVLA Project: B. Anderson, Jodrell Bank Observatory R. Escoffier, ALMA project F. Schwab, NRAO Scientific Staff J. Webber, NRAO CDL • Project Manager: P. Napier • Project Scientist: R. Perley • Systems Engineering: J. Jackson, G. Hunt • Interfacing Subsystems: M/C: B. Sahr Fiber Optics: S. Durand IF: T. Cotter Data Management: T. Cornwell Civil Engineering: G. Stanzione EVLA Correlator CoDR Nov 2, 2001.