1 / 20
Download Presentation

INSA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INSA Lyon

  2. INSA-Lyon: institute of excellence INSA Lyon Founded in 1957 by Capelle, Rector of the educational district of Lyon

  3. INSA-Lyon: institute of excellence Located on one of most important french Technological Campus INSA Lyonis the leading Engineering College of an important network of 5 institute (Lyon, Rennes, Rouen, Strasbourg,Toulouse) which confers nearly 13% of all French engineering degrees (Master Level).

  4. INSA-Lyon: institute of excellence In 2001 INSA-Lyon celebrated its 40th graduation More than 25 000 engineeringstudentsgraduated from INSA Lyon.

  5. INSA-Lyon: institute of excellence In the year 2001-2003, INSA’s outstanding level of performance was acknowledged in 4 prestigious publications: - Voted top 5-year French engineering school by “L’Etudiant” magazine - Ranked in the top 10 French engineering schools by “Le Nouvel Economiste” magazine - Ranked 2nd among French engineering schools in terms of Research and Development turnover(more than 1,050 industrial contracts with a total turnover of more than 15.3 Million Euros) by the monthly “Industries et Technologies” magazine - Ranked 4th among Europe’s “non-university” institutions for the number of Socrates exchange programme by the National Socrates-Leonardo agency.

  6. A 5-year programme INSA-Lyon trains: - highly qualified engineers - 6% of them go on a PhD thesis. • A multidisciplinary institute Over 800 qualified engineers per year in 11 different specialized fields • Open to the professional world - Several internships (up to 10 months) - R&D Projects in cooperation with industry - 15M Euros of annual research grants from industry

  7. A 5-year programme • Multi-skilled training integrating Science, Technology, Art, Culture and Management - a Humanities Center, a sport center - an “Engineer-Entrepreneur” section - Art Studies sections (music, dance, theatre, plastic arts) - A High-Level Sports section - 100 student clubs and associations

  8. A 5-year programme 11 Specialized engineering fields • Biochemistry and Biocomputing(47graduates per year) • Civil Engineering and Urban Development (120 graduates per year) • Electrical Engineering (122 graduates per year) • Energetics and Environmental Engineering (68 graduates per year) • Mechanical Engineering Design (136 graduates per year) • Mechanical Engineering-Development (85 graduates per year) • Materials Science Engineering (82 graduates per year) • Industrial Engineering (76 graduates per year) • Computer Science (124 graduates per year) • Telecommunication (76 graduates per year) ENGINEERING DEGREE Entrance at Bachelor level for foreign and french (5%) students Entrance for other french (20%) students 2nd CYCLE 3 YEAR Graduate Level 1st CYCLE 2 YEAR UNGRADUATE LEVEL INCLUDING 3 INTERNATIONAL SECTIONS ASINSA, EURINSA AND AMERINSA SCIENCE-BASED A ’-LEVELS PROFESSIONNAL LIFE PHD 5 Advanced Masters Research Master Master Level 5 4 3 2 1

  9. Post Master programmes ENGINEERING DEGREE 22 Doctoral programmes offered • Inorganic Chemistry • Analytical Chemistry Sciences • Waste Sciences and technologies • Towns and societies • Dimensions Cognitives et Modélisation • Control Systems Engineering • Integrated Electronic Devices • Electrical Engineering • Images and Systems • Analysis and Modelling of Biological Systems • Multimedia Documents, Images and Communicating Information Systems • Knowledge discovery in databases • Industrial Engineering • Biochemisty • Material Science and Engineering ; microstructure, mechanical behavior, durability. • Polymer Materials and Composites • Condensed matter surfaces and interfaces • Partial Differential Equations, Numerical Analysis and Scientific Computing • Acoustics • Civil Engineering : Grounds and Urban Hydrolog, Materials and Structures, Building and Environment • Mechanical Engineering • Heat Transfer and Thermal Energetics 5 advanced Master’s courses • Management of the Environment • Computer Science • Internet Engineering • Technical Director of Live Shows • Industrial Engineering PROFESSIONNAL LIFE PHD 5 Advanced Masters Research Master Master Level

  10. A dynamic international policy • More than 180 partner universities throughout the world • Very high mobility rates: 70% spend one or two semesters abroad • Increasing numbers of foreign students on campus: - 72 different nationalities - 1 out of 5 is a non french native

  11. A dynamic international policy International Sections 2 years programme: • EURINSA : (created in 1991) 130 students per year 1/3 french, 1/3 from EC, 1/3 others Eurpean countries • ASINSA : (created in 1998) 100 students per year 1/2 french, 1/2 from Asia (China, India, Vietnam…) • AMERINSA : (created in 2000) 50 students per year 1/2 french, 1/2 from Central and Latin America

  12. A dynamic international policy • 10 foreign languages as well as french as a foreign language are taugh • Specific linguistic groups

  13. A centre for research and socio-economic development 27 research laboratories - 575 research faculty and permanent researchers - 240 research master students of which 94 are engineering students - 450 doctoral students - 130 theses presented each year - 1250 publications and international communications

  14. A centre for research and socio-economic development INSAVALOR: a private subsidiary encouraging industrial applications of research (1,050 industrial contracts worth more than 15.3 Million Euros in turnover per year) and a centre for industry and innovation which hosts 25 companies. October 2002 : INSA was ranked 2nd among French engineering institute in terms of Research and Development turnover by the monthly magazine ‘Industries et Technologies’.

  15. A centre for research and socio-economic development Technological research focused on engineering sciences: • Materials :Functional Materials, Structural Materials, Civil Engineering, Metals, Ceramics, Polymers • Mechanics :Solid Mechanics, Structural Mechanics, Tribology, Vibrations-acoustics • Energy and Environment: Systems Security, Clean Working Practices, Waste Management and Purification, Heat Transfer, Urban Engineering • Science and Technology of Communication and Information: Electronic Components and Systems, Computer Science, Robotics, Micro and Nanotechnologies, Telecommunications, Data Processing • Biology and Health: Health Care Engineering, Biotechnology, Biochemistry and Pharmacology, Interaction Biology, Bimolecular Synthesis

  16. Long life learning with INSACAST INSACAST has forty years of expertise in continuous education courses. INSACAST trains 2,500 people per year through more than 350 programs.(Annual turnover is more than 3m euros). • INSACAST offers a wide variety of courses : • 300 short tailor-made training. • 15 certified programs to meet the needs of industry. • 15 diploma courses according to demand. • 5 advanced Master in: Computing, Internet Engineering, Environment Management, Industrial Engineering and Performing Arts Management. • As part of its range of courses, INSACAST also offers : • One-to-one coaching. • An approach to teaching based on engineering practice and pedagogical methods. • The possibility of running on demand courses.

  17. INSA-Lyon: all facilities on campus A tradition of quality and excellence focusing on: (80% of students from outside the Lyon area) • Residence facilities - 3,200 beds/1,000,000 meals per year - 4 restaurant options - 80% of accommodation facilities renovated from 1995 to 2002 • Active student life: associations, sports and social clubs - Since 1997, a large student building run by the students union which co-ordinates around 100 student clubs and associations - 2,500 students (60% of all student) participates student clubs and associations.

  18. INSA-Lyon: all the facilities of a town on a campus • Clubs by theme: • Student association highlights: • “The INSA 24 Hours”- a cycle race and other animation attracting over 30,000 visitors • FORUM ORGANISATION – a forum with the participation of over 200 companies • ETIC – a student-run company, regularly ranked first among junior companies at a national level • The Humanitarian carnival – a week of solidarity events

  19. INSA-Lyon: all the facilities of a town on a campus Sport: part of the curriculum - A very active sports association, present in the majority of French university championship finals - A High-Level Athlete Sports-study section, participation of INSA students in the Olympic Games • Well organised cultural activities encouraging strong links with the town and local area: - an active cultural service - Combined art-study sections: • Music/Science Studies • Dance/Science Studies • Theater/Science Studies • Plastic arts/Science Studies - "La Rotonde des Humanités" A cultural centre with 400 seats/20,000 spectators per year.

  20. Institut National des Sciences Appliquées de Lyon 20, avenue Albert Einstein - 69621 Villeurbanne cedex Tél. (+33) 04 72 43 83 83 - Fax : (+33) 04 72 43 85 00 http://www.insa-lyon.fr - http://insanet.insa-lyon.fr

More Related