An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ohio Balanced Growth Program Program Overview and Update Kirby Date, AICP Cleveland State University

  2. Meadow Protection/Natural Areas Establishment • Allowing natural meadows instead of horticultural lawns, especially in larger open space areas, helps to reduce surface water flows, filter storm water, and enhance the rural environment • Controls are needed to ensure landscape quality

  3. Meadow Protection Regulations: How they work • Recommended for communities with mowing ordinances that would prevent natural area management • Permit Laws require an approved management plan; require review and monitoring • Exclusion Laws exempt native grass areas from mowing ordinance; initiated upon complaint • Proactive Laws require native grass areas in new landscapes; require review and monitoring

  4. Meadow Protection: Works ctd. • All are based on recommendations of identified “expert” • Some regulations are set up as setback regulations

  5. Meadow Protection Regulations: Issues • Relationship with meadow “expert” must be established (SWCD?) • Invasive and noxious weeds must be prohibited • Permit and Proactive type laws require professional plan preparation, establishment of review procedures and long-term monitoring • Public/neighbor education is critical • Inspection and enforcement are important

  6. Meadow Protection: Decision Points • Is a protection law needed? • Choose between Permit, Exclusion, and Proactive approach • Identify best “expert” • Establish review, inspection and enforcement procedures • Identify responsibilities for education and technical assistance of public

  7. Woodland Protection • Filtering and manage storm water • Reduce erosion • Protect steep slopes, wetlands and riparian areas • Critical to scenic site character • Enhance property values

  8. Woodland Protection Regulations: How They Work • Focused on new development sites • Requires arborist review prior to design • Incorporates design criteria into project review

  9. Tree Protection Regulations: works ctd. • Establishes standards for tree protection during and after construction • Establishes procedures for review, inspection, monitoring, and enforcement

  10. Woodland Protection: Issues • Initial site review and construction protection plan must be prepared by qualified professional • Size alone does not determine priority for preservation: should be based on species, health, sensitivity to disturbance, as well as size • True long-term tree protection requires avoidance of site compaction, hydrology alteration, and alteration of sunlight conditions for a large area around tree (up to 3 times width of drip line) • Monitoring and enforcement are critical – once a tree is gone or severely injured nothing can be done • Relationship to forest management requirements • Relationship to riparian setbacks

  11. Woodland Protection: Decision Points • Identify likely high priorities for preservation in comprehensive planning process • Identify procedures and responsibilities for review, inspection, monitoring, and enforcement • Identify experts who can provide technical assistance/recommendations to community

  12. Ed Hammett Executive Director Sandra Kosek-Sills Environmental Specialist lakeeriecommission@ameritech.net 419.245.2514 Kirby Date, AICP Best Local Land Use Practices Program Manager 216.687.5477 k.date@csuohio.edu Gail Hesse Administrator Gail.Hesse@epa.state.oh.us 614.644.2146

  13. Questions? Kirby Date, AICP Tel. 216-687-5477 k.date@csuohio.edu