1 / 23

Cable Rehabilitation at Oncor

Cable Rehabilitation at Oncor. by Richie Harp – Distribution Standards Data provided by Mark Darilek – Maintenance Planning. SWEDE 2009 – Tulsa, OK – Thursday, May 7, 2009. Cable Rehabilitation Overview. Rehabilitated cable Cable repairs to facilitate future rehabilitation

brandy
Download Presentation

Cable Rehabilitation at Oncor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cable Rehabilitation at Oncor by Richie Harp – Distribution Standards Data provided by Mark Darilek – Maintenance Planning SWEDE 2009 – Tulsa, OK – Thursday, May 7, 2009

  2. Cable Rehabilitation Overview • Rehabilitated cable • Cable repairs to facilitate future rehabilitation • Oncor requirements for rehabilitation • Further considerations • 2nd Responder process • Another technology

  3. Amount of Rehabilitated Cable • Began in 1995 • 420 cbl-mi rehabilitated • 8,000 cbl-mi in service – Pre-1993 cable • 22,000 cbl-mi total cable

  4. Amount of Rehabilitated Cable • URD • Cable size – Less than #4/0 AWG(#2 and #1/0 AWG, and minimalamount of #2/0 AWG) • Began in 1995 • 405 cbl-mi rehabilitated • 17,000 cbl-mi in service • 2% of URD cables

  5. Amount of Rehabilitated Cable • Feeder • Cable size – #4/0 AWG and larger (up to 1000 kcmil) • Began in 2008 • 15 cbl-mi rehabilitated • 3,400 cbl-mi in service • 0.4% of feeder cable

  6. Cable Repairs • Standard cable (Began purchasing in 1990) • #1/0 Al 19-Strands • Strand-filled conductors • 25 kV, 260-mil TRXLPE • 16-#14 AWG Concentric Neutral Wires (Full neutral) • Jacketed

  7. Cable Repairs (Cont) • Only for cable repairs (2-ft pieces) for future injection • #1/0 Al 19-Strands • Strands not filled • 25 kV, 260-mil TRXLPE • 8-#14 AWG concentric neutral wires(1/2 neutral) • Unjacketed • On 1000-ft composite reel

  8. Oncor Requirements for Rehabilitation • Do not rehabilitate: • Cable installed in conduit • 175-mil or 220-mil cable operating at 14.4 kV • Butyl rubber cable • Cable with tape conductor shield • Corroded concentric neutral

  9. Oncor Requirements for Rehabilitation (cont) • Do not rehabilitate cable if… • Corroded center conductor • Loss of insulation shield conductivity • Insulation shield with no adhesion • Failures due to dig-ins or debris in trench • There is a chance the cable will be converted to 14.4 kV in the future

  10. Other Requirements • There must be more than 25% concentric neutral remaining. • There cannot be more that one joint per 100 feet of cable. • The faulted cable section must not have been de-energized more than six months.

  11. Comments: • We tried to rehabilitate some open loops that had been de-energized for up to 2 years • Very little success • We quit rehabilitating open loops that had been de-energized for more than 6 months.

  12. More comments: • 2006 and 2007 Processes • Left URD loops open after failures (direct buried cables) • Only repaired cable to get customers’ lights back on.

  13. More comments: • Dec 2007 Process • Began repairing failed loops again. • Caught up with open loops (Feb 2009) • Inject cables or • Replace cable if not able to inject

  14. More comments: • Dec 2008 Process Change • Install joint to repair cable • Try to inject the cable • After the repair, if the cable is not able to be injected, then just leave energized. • Defer replacement of the cable until the next fault.

  15. 2nd Responder Process • System-Wide Process • Repair failures on direct buried cable (not in conduit) • Must be able to switch around to get lights back on. • Not normally feeder exits (Only non-critical cables)

  16. 2nd Responder Decision Process Flow Chart • Available by request

  17. 2nd Responder Process • 1868 sections of failed cables came through the process since 2008 • 749 sections of cable were injected • 1119 sections were not able to be injected • 922 due to process requirements • 197 not related to the process (already energized when arrived, in conduit, etc.)

  18. 2nd Responder Process – Injected/Not Injected

  19. 2nd Responder Process • 12 cause codes for not being able to inject the 1119 sections of cable • Age of fault (> 6 months) • Could not flow (Blocked strands or joints) • Inaccessible fault or joint location • Deteriorated neutral (< 25% remaining) • Previously injected, non-warranty or other • Previously injected, warranty

  20. 2nd Responder Process • 12 cause codes for not being able to inject the cable (Cont) • Corroded conductor • Number of joints (> than 1 joint per 100 ft) • Unknown • Cable is in conduit • Already energized upon arrival • Other • These last three represent the 197.

  21. 2nd Responder Process – Causes

  22. Another technology • Different formulations for injection fluid • Formulation tailored to operating environment • Tailored more for feeder cables with higher operating temperatures (»45°C) • No soak tanks required • Put back into service immediately after injection

  23. Another technology (Cont) • Must replace all joints • Higher pressures for injection