Project 4: User interface for logging food intake and activities
160 likes | 254 Views
Project 4: User interface for logging food intake and activities. Muhammad Zaman, Warren Trinh, Thanh Le, and Christine Liang. What is it?.
Project 4: User interface for logging food intake and activities
E N D
Presentation Transcript
Project 4: User interface for logging food intake and activities Muhammad Zaman, Warren Trinh, Thanh Le, and Christine Liang
What is it? • The project that we are working on is an online application where users can register their daily diet information and physical activities into a calendar log. • The application will allow diabetics to track their progress and provide notes on how to improve their diet. • Our primary focus is to test the application for usability issues and suggest ways to improve the app. • We are also assigned the task of improving the look and feel of the site by changing the CSS.
Usability/Heuristic Problems • There was no way for the user to delete and edit meals/ meal items / activities • User had to search the exact name of an item to search for it • There was no way for the user to check what meals have been added beforehand • The website did not provide significant feedback to the users • The site is incomplete and the glucose functions that the diabetic user would need are not supported
Usability Research Methods • Two Iterations of Usability Testing • 12 users in total • 8 users for first iteration • 4 users for second iteration (two returners) • At least 1 Diabetes Patient per iteration • Target User • Type 2 Diabetes Patients (Primary) • Dieters • Nutrition/Health Enthusiasts • 30-40 minutes • Background Questionnaire • Pre-Test Interview • "Think Aloud" Testing • Post Test Interviews
Pre-Test Interview • Initial impressions of the interface • Expectations from the options on the website • Is the terminology understandable? • Rate the ease of use based on initial impressions
"Think Aloud" Testing • Hardware/Software: • Laptop • Screen capture software • Microphone • Webcam to capture facial expressions • Present various scenarios for the user to complete • Between 5 and 10 scenarios • Always the same set of scenarios for each user
Tasks • Meals • Create a meal with items: new item, search DB items, find info, create new quantity • Create a meal with text description • Search an existing meal • Edit a meal • Delete a meal • Activities • Create an activity • Search existing activities • Edit activity • Delete an activity • Glucose • Add Glucose • Edit a Glucose entry • Delete a Glucose entry • Review Diary • Add a new guide • Edit the guide • Review data from a specific date • Search - TBD
Post-Test Interview • System Usability Scale (Sample question will not actually be used, only the format will.) • Follow up questions about observations made during the "think aloud" testing phase
Contacting Users • Recruiting through word of mouth • Close friends who are within the target user group • Flyers for volunteers • Only if necessary • Provide incentives in the form of Starbucks gift cards.
Week 2: Initial Heuristic Analysis - Everyone Brief Usability Protocol - Everyone Look over CSS code - Thanh and Warren Week 3: Heuristic Analysis Document - Muhammad and Warren Usability Protocol - Christine CSS Documentation - Thanh and Warren Week 4: Initial Presentation (4/20) Iterate Usability Protocol - Christine Interim Heuristic Analysis 2.0 - Muhammad Recruiting - Muhammad and Christine Week 5: Usability Testing - Everyone Recruit for Round Two Week 6: Implement of Changes - Client Analyze Data - Everyone Redoing Usability Protocol - Christine Preparing for 2nd Round of Testing Week 7: Interim Presentation (5/9) Usability Testing Round Two- Everyone Week 8: Final Implementation of Changes - Client CHI Presenation - Client Week 9: TBD Week 10: Final Presentation (5/30) Project Timeline