1 / 7

Queries raised by Director (Tariff) on ARR and Tariff Application of WESCO for FY 2010-11 on 16.02.2010

Queries raised by Director (Tariff) on ARR and Tariff Application of WESCO for FY 2010-11 on 16.02.2010. WESCO has proposed power factor penalty to be levied on the following categories of consumers.

bjorn
Download Presentation

Queries raised by Director (Tariff) on ARR and Tariff Application of WESCO for FY 2010-11 on 16.02.2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Queries raised by Director (Tariff) on ARR and Tariff Application ofWESCO for FY 2010-11 on16.02.2010

  2. WESCO has proposed power factor penalty to be levied on the following categories of consumers. In this connection we would like to know whether these consumers have been provided with static meters to measure power factor directly.

  3. WESCO has proposed demand charges to be levied in terms of KVA on the consumers having CD >70 KVA <110 KVA (both HT and LT). Whether these consumers are having static meters to record demand in KVA. • WESCO has suggested that the full cost of single phase meter is to be recovered through security deposit. OERC in its RST Order has prescribed cost of meter to be recovered through meter rent. The Licensee may clarify how it shall continue to collect meter rent in cases where it proposes to recover cost of meter through security deposit. Further, because of the fact that certain consumers are not able to pay the full cost of the meter through security deposit, OERC has introduced the concept of meter rent. In such situation how is the licensee proposing to collect the full cost of the meter through security deposit.

  4. WESCO has proposed to raise the service connection charges from the existing Rs.500/- per connection to Rs.1000/-. The Licensee may please provide the basis of proposed service connection charges with necessary calculation. • WESCO is required to submit each individual bill of HT and EHT consumers for FY 2009-10 (i.e. upto December, 2009) with necessary computations of average rates thereof to enable the Commission to verify the same with the average rates per unit as approved in the Tariff Order 2009-10. • WESCO should submit a plan for further reduction of cross-subsidy payable by the HT and EHT consumers. • The Licensee should submit the revenue outgo due to TOD benefit, improvement of power factor, prompt payment rebate for FY 2008-09 and 2009-10. WESCO also should submit revenue receipts on account of power factor penalty, overdrawal penalty and DPS for the said period.

  5. WESCO should submit T-6 Format (Upto Dec, 09). • It is observed from SLDC online data from 15th January, 2010 to 7th February, 2010 that WESCO has not adhered to the protocol issued by the Commission on Power Regulation dtd. 14.01.2010 and violated the implementable day ahead schedule of SLDC as a result of which the licensee has overdrawn during these days totaling to 21.83 MU more than its entitlement. This has an UI impact of Rs. 7.48 cr. WESCO may explain reasons of such over-drawal and non-adherence to Commission’s protocol on Power Regulation. • As per a tentative estimate, if Bachat Lamp Yojana of BEE is adopted in mission mode throughout WESCO, then annual saving of energy would be about 574 MU resulting in less drawal of 111 MW in evening peak hours from the State Grid. WESCO may intimate the status of implementation of Bachat Lamp Yojana at this acute shortage of power under which State is passing through.

  6. It is understood from the filing of the licensee that for the year 2008-09, Basic Pay and DP/GP include arrear impact of 6th Pay for the previous period. To determine Base level figure for 2008-09, WESCO is required to furnish the following data pertaining to year 2008-09 only excluding the arrear impact. Information may be furnished in the following table: For FY 2008-09 • The figure of Basic Pay + Grade Pay only for the month of October, November and December of the current financial year excluding any arrear component pertaining to the previous year may be submitted. • The licensee is required to submit the interest earnings from consumer security deposits for the financial year 2008-09 and 2009-10 by way of investments in various instruments. Further WESCO is required to furnish the income from other sources such as supervision charges etc. for the above purpose. • Utilisation of A&G expenses over and above the normal rise allowed by the Commission for 2008-09 & 2009-10 may be furnished.

  7. THANK YOU

More Related