180 likes | 293 Views
This document showcases instruments and sites used in the CryoVEx 2006 mission around Greenland, focusing on ice cap research. It includes details on calibration, camera technology, and data analysis from the expedition.
E N D
CryoVEx 2006 Lars Stenseng ph.d. student stenseng@space.dtu.dk
Around Greenland CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 2
Instruments in the Air Greenland OY-POF CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 3
Kangerlussuaq Laser Calibration Site CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 4
Downward Looking Camera CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 5
EGIG LineT05 and T12 CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 6
T05 Corner Reflector CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 7
T12 Corner Reflector CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 8
Austfonna CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 9
Austfonna Icecap CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 10
Kongsvegen CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 11
Devon Icecap CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 12
First Year Sea Ice North of Alert CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 13
Multi Year Ice North of Alert CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 14
ASIRAS Datation(Veit Helm, AWI) No time correction -0.24 sec correction Figure by V. Helm CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 15
Datation Test (YLT2) CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 16
Datation Test (YLT1, YLT3, YLT4) CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 17
ASIRAS now and in the Future • Extreme data volume in LAM mode (4.5 Tb) • High tower vs. rack cabinets for aircraft installation • OS on ASIRAS PCs is reaching end of life • ASIRAS dependant on legacy GPS receiver (Trimble 4000) • Real time display of waveform data • CR positioning using geodetic quality GPS receivers ? ? ? ? ? CryoVEx2006 | 7th CVRT, ESA ESTEC, October 18 - 19, 2007 | stenseng@space.dtu.dk | page 18