Achieving Changeover Flexibility Brigham Young University Prepared by: Kortney J. Jurado

Achieving Changeover Flexibility Brigham Young University Prepared by: Kortney J. Jurado. What will be covered… Changeover Flexibility Defined How can this help our firm? Real world example How do we get there? Exercise Summary. Changeover Flexibility Defined.

betty_james
Download Presentation

Achieving Changeover Flexibility Brigham Young University Prepared by: Kortney J. Jurado

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Achieving Changeover FlexibilityBrigham Young University Prepared by: Kortney J. Jurado

  2. What will be covered… • Changeover Flexibility Defined • How can this help our firm? • Real world example • How do we get there? • Exercise • Summary

  3. Changeover Flexibility Defined The ability to switch from making one product to another one without incurring high setup times

  4. Production Lead Time • Queue: Time waiting before the operation begins • Setup: Time getting ready for operation • Run: Time performing operation • Wait: Time waiting after operation ends • Move: Time physically moving between operations

  5. Brainstorming Exercise How will our company benefit from achieving changeover flexibility?

  6. Current Market Demands • Less costly • Higher quality • Shorter lead times • Increase in average mix

  7. The Why… • Customers increasingly demand more customized products • Reducing setup times allows us to be more responsive to customer needs • If setup times are reduced at the bottleneck, capacity increases • Able to convert runs into smaller lot sizes

  8. Real World Example: • Dr. Shigeo Shingo’s success at Toyota with “single digit setups”

  9. Single Minute Exchange of Die (SMED) • Identify internal and external setup activities • Determine internal events which can be converted to external activities • Reduce time it takes to perform those internal and external events • Repeat the process

  10. Identify Internal and External Events • External: can be done while machine is running previous job • Ex: staging materials, getting specs and drawings • Internal: require the use of the machine • Ex: removal of the die

  11. Determine Internal Events That Can Be Converted to External Activities • What changes can we make to our process or machinery? • Example: A company modified the machine so that the mount and the die could be removed as one piece

  12. Reduce Times for Both Internal and External • Internal tasks will remain our constraint • Why do we need to reduce the time on our external activities?

  13. Repeat the Process • What else can be removed from internal setup? • Can reduce a task by a few more seconds? • What else can we do to reduce our setup times?

  14. Applying Shingo’s Method to Our Setups • Split into groups and take a setup through Shingo’s four steps

  15. What did we learn? • How can setup time be reduced? • What can we do to make it easier, simpler, and safer? • Can we do something more?

  16. Another Tool: 5-S • Sort • Simplify • Scrub • Standardize • Sustain

  17. Sort • Separate items that are used daily from those that are used occasionally • Remove little used items from your workspace

  18. Simplify • Set in order • Arrange items so they are easy to see, use, and put away • Ex: carpenter’s shop • If tools are used sequentially, place them in that order

  19. Scrub • Clean the work area • You will not need to be cleaning during a changeover

  20. Standardize • Sort, • Simplify, • And Scrub DAILY • Make it a habit!

  21. Sustain • Continue to continue • There will be changes over time • Start from the beginning again and again

  22. Exercise • Divide into groups • Create a plan to run your work area through the 5-S process • Discuss your plan with your teammates

  23. What did we learn? • How does 5-S affect changeover flexibility? • How can our setup times benefit from the use of this tool?

  24. Evaluation • List and explain the steps to SMED • List and explain the steps in 5-S

  25. Summary • Changeover Flexibility = • Profits • Competitive Advantage • Greater responsiveness to market demands • Increased capacity

  26. Readings List • Vivek Sharma. (January 2001) Circuits Assembly. Vol. 12, Iss. 1; pg. 62, 5 pgs • Kathryn Martin.  "Packaging line changeovers: Flexibility means profit. " Food Engineering  1 Jun 1999: ABI/INFORM Trade & Industry, ProQuest. Web.  12 Apr. 2010. • Spada, S.. (2007, October). Packaging equipment goes mechatronic. Machine Design, 79(19), S10.  Retrieved April 12, 2010, from ABI/INFORM Global. (Document ID: 1368586341). • Cheryl Gaimon, & Alysse Morton. (2005). Investment in Facility Changeover Flexibility for Early Entry into High-Tech Markets. Production and Operations Management, 14(2), 159-174.  Retrieved April 12, 2010, from ABI/INFORM Global. (Document ID: 891741341).