An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vending Machine Characterization Study: Phase II Presented atRegional Technical Forum June 2, 2009 Presented byDoug BruchsThe Cadmus Group, Inc.

  2. Overview • Review of Phase I • Goals of Phase II • Methodology • Findings • Programmatic Recommendations

  3. Phase I: Overview • Market Characterization Study • Results presented at August 2007 RTF meeting • Research Questions • Who are the major market actors? • What is the size and age of the vending market? • What are the latest trends in machine design? • What are the current replacement and refurbishment practices? • What energy efficiency opportunities exist?

  4. Phase I: Methodology

  5. Phase I: Findings • Approximately 120,000 machines • Majority between 7 and 11 years old (1996-1999) • Collectively consume 400 Million kWh annually • In the field between 10 to 15 years • Annually, between 6,000 to 12,000 new machines are purchased; virtually all ENERGY STAR Tier 1 • Coke/Pepsi bottlers own approx. 90% of refrigerated machines • Glass-front machines growing due to their ability to vend a wide-array of products

  6. Phase I: Efficiency Opportunities Identified Measures/Actions • De-lamping (pre-1996 vintage machines) • Thermostatic controls (1996-1999 machines) • Fan motors and thermostatic controls (2000-2003 machines) • Software controls (2004-present machines)

  7. Goals of Phase II Narrowing of Scope • Focus on measures, not market • Generate programmatic recommendations Assess the Viability of Identified Opportunities • Refine energy savings potential • Determine implementation costs/methods • Explore industry acceptance

  8. Phase II: Methodology Technical Research • Interviews with refurbishment centers, machine manufacturers, and USA Technologies • Leased a common machine and procured, installed, and metered: • Baseline Conditions • T8 – T12 Lighting Kit Conversion • De-lamping • Thermostatic Control Installation (VM2IQ) • Concurrent Cadmus EPA Study • 25 new ENERGY STAR machines were metered with and without software controls activated

  9. Phase II: Methodology Market Research • Interviews with 20 regional bottlers • Initial reaction • Percent of eligible fleet likely to participate • Motivations and barriers to participation • Willingness to alter current practices to utilize a program • Ease/difficulty of implementation • Availability and capacity of resources for implementation • Technical ability to implement more advanced options • Impact of various incentive levels

  10. Phase II: Findings of Technical Research

  11. Phase II: Findings of Market Research • Bottlers not overly enthusiastic about any of the programs • Only take action when required by host site • Schools, government buildings, etc. • “Need” full cost recovery • $65/hr for vendors • $85/hr for technical staff • Primary bottler concerns • Costs • Advertising • Competitive equity • Lack of experience/training • Corporate oversight

  12. Phase II: Recommendations Three Potential Programs • Host Site-Driven De-Lamping Program • Host Site-Driven Software Program • Bottler-Driven Thermostatic Controls Program Selection Criteria • Savings potential • Implementation feasibility

  13. Phase II Recommendation: Host Site-Driven De-Lamping Program Offer host sites $20/machine to de-lamp all vending machines • Impacts all vintages • Leverages host site market force • Can be completed during regular visits to site by vendor • Administratively simple and fair as it applies to all vintages

  14. Phase II Recommendation: Host Site-Driven De-Lamping Program

  15. Phase II Recommendation: Host Site-Driven Software Program Offer host sites $40/machine to enable software controls on all post-2004 machines • Achieves the full savings potential of the newer units • Leverages host site market force • Administratively simple and fair as it applies to all new machines • Training likely required, but can be completed by vendors on usual trips to site

  16. Phase II Recommendation: Host Site-Driven Software Program

  17. Phase II Recommendation: Bottler-Driven Thermostatic Controls Program Incent bottlers $150/machine to install thermostatic controls (most likely VM2IQs) during regular refurbishment cycle • Generated significant savings on test machine (aligned with the manufacturer’s estimate) • Less cost-effective but applicable to the largest active vintage (1996–1999) • Invisible to end user and more persistent then external VendingMisers • Training likely required and must be completed by a technician • Concerns about machine wear—education likely needed

  18. Phase II Recommendation: Bottler-Driven Thermostatic Controls Program