160 likes | 426 Views
Updates on School-based Assessment (SBA). School Leaders’ Briefing Session 5 March 2012. Updates on SBA. S6 Submissions for 2012 HKDSE S5 Submissions for 2013 HKDSE SBA Streamlining Arrangements. S6 Submissions for 2012 HKDSE. Scheduled to be completed by 20 Mar 2012
E N D
Updates on School-based Assessment (SBA) School Leaders’ Briefing Session 5 March 2012
Updates on SBA • S6 Submissions for 2012 HKDSE • S5 Submissions for 2013 HKDSE • SBA Streamlining Arrangements
S6 Submissions for 2012 HKDSE • Scheduled to be completed by 20 Mar 2012 • Review of SBA marks/work samples and SBA moderation conducted in Feb – May 2012 • Moderation for network programmes • Review and improve the submission arrangements in light of the 2012 experience
Moderation for Network Programmes • Some schools join together to offer network programme for NSS subject(s) • If students from these “network schools” are taught and assessed by the same teacher(s) using the same assessment standards, it would be desirable to group these students into a single moderation group, so that students within the network will receive comparable moderated results • Schools will be requested to confirm whether they have formed such networks in S6 this year (for the 12 subjects with SBA in 2012 HKDSE only) through a school circular, to be issued in mid Mar 2012
S5 Submissions for 2013 HKDSE • Submission Period: 3 May – 13 July 2012 Ref: School circular dated 7 Oct 2011 http://www.hkeaa.edu.hk/DocLibrary/DSECirculars/2012HKDSE-SBA-Schedule.pdf • Submission arrangements similar to 2012 exam • Full details to be provided in the mid Mar school circular
SBA Streamlining Arrangements For 2014 HKDSE (i.e. this year’s S4 students): • SBA in the following nine subjects will be streamlined: Chi Lang, Liberal Studies, Biology, Chemistry, Physics, Science, Chi History, History, Visual Arts • Ref: School circular dated 28 Feb 2012 http://www.hkeaa.edu.hk/DocLibrary/DSECirculars/HKDSE-FinalArrangeStreamlining.pdf
SBA Streamlining Arrangements For 2013 HKDSE (i.e. this year’s S5 students): • Streamlined SBA for Chi Language advanced to 2013 exam • Interim measures adopted for Liberal Studies • In both subjects, the tasks/marks to be completed in S5 remain unchanged
SBA Streamlining Arrangements For eleven deferred subjects: • Full implementation of SBA postponed to 2016 HKDSE exam, with trials conducted in 2014 and 2015 exams • SBA designs of six of these subjects will also be streamlined
SBA Streamlining Arrangements • Two identical teachers’ seminars held on 20,22 Mar to explain to LS teachers the adjustments that need to make to the Independent Enquiry Study (IES), in light of the streamlining arrangements • Updated assessment frameworks will be made available in the HKEAA website in April 2012