An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Continuous Planning 15-887 Planning, Execution, & Learning Term Project Trey Smith May 2, 2000

  2. Talk Outline • Planning outside classical paradigm (recap on Martha Pollack’s talk) • A continuous planner (CASPER) • Multi-resolution planning • Concept overview • A home-brew probabilistic resource representation • Dana Nau’s Simple Hierarchical Ordered Planner (SHOP) • My MRP implementation

  3. Outside Classical Planning • Ways in which real world planning violates the classical planning paradigm: • Varying degrees of goal satisfaction • Multiple agents • Actions have temporal extent • Incomplete knowledge • Probabilistic world state, action effects • Dynamic environment (exogenous events) • Dynamic goals

  4. Continuous Planning • Avoid batch-style sense-plan-act setup • While executing, continuously modify plans on the basis of • New state information • New goals • Interleave planning and execution because • Devoting less time to planning leaves more time for acting • Early execution gains information to help later planning • Well, how about if we have two processors?(or maybe just periods during which we have nothing to do but think anyway)

  5. Continuous Planning • Blurs line between planning and execution. Scaling from less capable to more capable executive: • Execute a sequence • Execute a conditional sequence with explicit branch points to handle failures • Same as above, but with opportunistic side-plans • Same as above, but with state projection and resource conflict detection on the fly • Same as above, but with plan repair ability ?

  6. CASPER • Continuous Activity Scheduling, Planning, Execution, and Replanning • ST4 Champollion mission scenario • On-going, iterative repair strategy, plans and replans in response to • State conflicts (e.g. equipment failure) • Resource conflicts (e.g. oversubscription of memory) • Activity updates (e.g., drilling finishing late) • New goals • JPL, Steve Chien; iterative repair is an old idea

  7. CASPER • Mars scenario: central, static planner distributes plans to continuous planners on multiple rovers • Improved response time (RAX took 4 hours for a 3 day plan). Implies • Models don’t need to be as detailed • Fewer scenarios require explicit recovery in executive procedures

  8. CASPER • Weakness of current implementation: not very good at noticing new opportunities, since repair is based on conflict detection • Claim: Distinction between planner and executive is now just a matter of horizon length • How does it address this trade-off? • Need for expressive procedural control • Difficulty of reasoning about an expressive language

  9. Abstraction Time Multi-resolution Planning • Plan at higher detail for critical times • Near term, because • We need to execute it now • We have more information about it • Crisis points (e.g. planetary fly-by) • Times when resources tend to be oversubscribed • Trying to guarantee the downward solution property: there may not be a suitable abstract plan • With less data, may be forced to do contingency planning

  10. Probabilistic Resource Representation • Amount of resource remaining, or usage of a particular action, is a random variable X • The randomness may come from true uncertainty, or from bounded rationality. • Representation of X as intervals with probability assignments { ([t00..t01], p0), ([t10..t11], p1) } • Says “proportion pi of the probability mass lies inside interval [ti0..ti1]”. • Same interval may be specified more than once, and intervals may overlap. • General rule is, for pairs (T1, p1), …, (Tn,pn) P(X in T1 U … U Tn) > p1 + … + pn • Allows +infinity and -infinity values for interval endpoints.

  11. Probabilistic Resource Representation A • Can easily add intervals • Generalize to adding the entire random variables • With n intervals, get a lower bound on P(X > a) in O(n) time • Adding k random variables with q intervals each gives n = q^k B A+B A B A-B X={(A,0.5)} Y={(B,0.2), (C,0.3)} X+Y={(A+B,0.1), (A+C,0.15)}

  12. Probabilistic Resource Representation • Comparison to other representations • Probabilistic aspect (c.f. C-Buridan, Weaver) • Possibilistic aspect (c.f. Matt Mason’s talk) • Related to Goodwin & Simmons work on bounding intervals for abstract plans • Advantages • Easy to come up with this kind of possibilistic, probabilistic mix (as opposed to having to specify a distribution) • Probabilistic OR, arithmetic operations are easy (though the complexity can get bad if not careful… interval merging?) • I don’t have a good way of representing possibilistic OR • Summary: not sure when this approach would be more useful than existing techniques: just an idea

  13. SHOP • Simple Hierarchical Ordered Planner (Dana Nau) • Served my purposes very well • Licensed under GPL • Entire planner about 500 lines of LISP • Well documented, lots of examples • Algorithm too restrictive for full-bore multi-resolution planning

  14. SHOP algorithm • Very much in the STRIPS vein • Select first task • Choose a variable binding which unifies it with an operator (primitive) or method (abstract) • If we chose a method, select an expansion based on the current state • Makes it trivial to maintain state • SHOP allows arbitrary LISP expressions to modify state Track state here

  15. Consultant Domain • Fly-by-night programmer chooses what work to do each day, has active night life that requires lots of cash • Could design a web site or hack a bank • Web site • Porn sites don’t yield much money • On-line auction sites yield more but require sub-contracting to finish on time, so you need front money • Bank hacking • Potentially more lucrative, but no guaranteed payoff • Some banks riskier (but more profitable) than others • Goal statement: live for a few days, end up with money at least a with probability p.

  16. Multi-resolution Aspect • I added a feature to SHOP which does DF iterative deepening on the resolution parameter • Preconditions of some method expansions depend on the value of resolution. • I set up the domain to have the downward solution property: for instance, if you don’t choose which bank to hack (at low resolution), the result of the action is as risky as any bank and as low-paying as any bank. • As a result, there may be no plans at low resolution, forcing you to try planning at high resolution.

  17. Some results • The planner can come up with 3-day plans like: • Lax constraints on final cash (works at low-res) • do-web-site, do-web-site, do-web-site • Tighter constraints on final cash • do-porn-site, do-porn-site, do-auction-site • Note that we didn’t need to plan everything in detail, but did • Require more cash, but risk allowed (small p) • do-web-site, do-web-site, hack-bank • Timing example (CPU time, seconds): • Multi-res on: easy=0.09 hard=0.29 • Multi-res off: easy=0.19 hard=0.20