1 / 5

Issues on a new evaluation for functionally distributed network architecture

Issues on a new evaluation for functionally distributed network architecture. 16th NGN-WG TTC Kentaro Ogawa (NTT) E-mail: ogawa.kentaro@lab.ntt.co.jp TEL: +81-422-59-3886 FAX: +81-422-59-4549. Background.

Download Presentation

Issues on a new evaluation for functionally distributed network architecture

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Issues on a new evaluation for functionally distributed network architecture • 16thNGN-WG • TTC • Kentaro Ogawa(NTT) • E-mail: ogawa.kentaro@lab.ntt.co.jp • TEL: +81-422-59-3886 • FAX: +81-422-59-4549

  2. Background • ◆ Testing on functionally distributed network architecture led by TTC is underway and focused mainly on the “Architecture” and “Functionality”. • ◆ TTA proposed to collaborate on a new evaluation for “Scalability” and “Performance” of functionally distributed network architecture at the 15th NGN-WG meeting. • ◆ In order to begin the new evaluation, we must clarify issues and discuss a concrete way to conduct the evaluation.

  3. Overview of the evaluation plan • Conduct a simulation study on the scalability and performance of functionally distributed network architecture. • Prepare test cases for both cases and CJK can conduct the test cooperatively based on the test cases. • Test will consist of three scenarios. • Phase 1: Testing based on the simulator only • Phase 2: Testing based on the mix of simulator and actual CE/FE/SE involvement • Phase 3: Testing based on the actual CE/FE/SE only • Simulator can be cooperatively developed among CJK

  4. Issues to be clarified • Evaluation items should be clarified. • Scalability • Should be clarified: Network construction costs, Number of steps of network (re)configuration, Number of entities required to add new services/functions, User capacity per number of entities, Amount of information to be managed. • Performance • Should be clarified: Time to stable state of networks, Time to recovery from link/entity failure, Communication delay of configuration/notification/redirection between entities. • Other evaluation items are appreciated. • Evaluation environment should be clarified. • Making a choice of feasible evaluation items. • Coverage region of the simulator for evaluation items. • Comparison with existing networks. (Target network size: over 10000 FEs) • Simulator implementation. (making original SW or diverting commercial SW) • Platform, performance, number of machines and location for the simulator. • Test schedule

  5. Thank you for your attention. This work is partly supported by the National institute of Information and Communications Technology (NICT).