slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053) PowerPoint Presentation
Download Presentation
Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053)

Loading in 2 Seconds...

play fullscreen
1 / 1

Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053) - PowerPoint PPT Presentation


  • 104 Views
  • Uploaded on

Surface Penetration Hazards Mitigation. Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053) For depth greater than 1 ½ inches Not just ground Floors, slabs, walls, ceilings, beams, fixed structures, etc. Not just digging

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053)


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Surface Penetration Hazards Mitigation

  • Permit Required to Penetrate Ground or Existing LBNL Surfaces (Facilities ADMN Procedure 053)
    • For depth greater than 1 ½ inches
    • Not just ground
      • Floors, slabs, walls, ceilings,beams, fixed structures, etc.
    • Not just digging
      • Drilling, probing, nailing, ANYTHING THAT PENETRATES an existing surface
  • Call Before You Dig, Drill, Probe, Nail……..