rdav update n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
RDAV Update PowerPoint Presentation
Download Presentation
RDAV Update

Loading in 2 Seconds...

play fullscreen
1 / 6
armando-sykes

RDAV Update - PowerPoint PPT Presentation

59 Views
Download Presentation
RDAV Update
An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. RDAV Update • Phil Andrews • Science Advisory Board Meeting20-21 January 2011

  2. Executive summary • Nautilus SGI UltraViolet passed all acceptance criteria and was accepted by NICS/RDAV in September 2010. • RDAV resources have gone through TRAC allocations twice and we have currently active users. • Allocations are lower than expected. • Use is lower than expected. • Early users are transitioning to TRAC / Director’s Discretionary users.

  3. Hardware status • Nautilus: The full SGI UltraViolet has been delivered and accepted: • The full UltraViolet machine was delivered and integrated into the NICS infrastructure. • There were issues with stability and PCIe performance during the acceptance tests. Those issues have been resolved and the machine accepted. • Graphics cards: There are issues that prevent delivery of the GPUs on Nautilus: • NVIDIA has decided not to scale their driver to support more than 8 GPUs per single system image. Thus, we cannot deliver the full 16 GPUs on Nautilus. • Even worse, there are communication problems on the UltraViolet that cause system stability problems when the GPUs are exercised. Until this is resolved, we have disabled access to the GPUs. • Parallel filesystem: The 960 TB GPFS parallel filesystem has been deployed on Nautilus. • We continue to explore issues with bandwidth, as we are seeing only ~1 GB/s. It appears to be a design issue with GPFS. We are talking with IBM about these issues. • We are working to enable cross-mounting of the parallel filesystem on Kraken for HPC users. • Portal: Our portal system is operational and we are working to deploy new capabilities on it.

  4. Software and environment status • Software systems: • VisIt has been ported and runs well. It was a major component of our acceptance tests. • ParaView porting has begun. • Remote visualization systems are deployed and secure: NX, VNC • Workflow systems work well. • R runs acceptably, and several packages for exploiting parallelism have been deployed to users. • User environment: • We continue to explore issues related to job placement, and have deployed a NUMA-aware Torque for scheduling. • We are moving batch scheduling and login processes to a separate system to reduce user contention.

  5. Allocated projects

  6. Education, Outreach, and Training activities • Presented a tutorial on Nautilus usage for visualization, data analysis, and workflow management at the TeraGrid'10 conference in Pittsburgh. • With LLNL and LBNL, taught a full day class on VisIt at the Supercomputing 2010 conference in New Orleans.