An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. nSQP Technical Meetinghttps://indico.cern.ch/conferenceDisplay.py?confId=174277 Monday 23/1/12 Mar Capeans nSQP Tecnical Meeting

  2. Agenda nSQPTecnical Meeting

  3. Technical Meetings Format • Structured reports on the progress of different activities, with a focus on the assembled nSQPs, pointing out critical aspects (technical, resources) as they come • Assembly Progress Chart • Procurement > SM, SW, ET, HD • Report from the mechanical team > VA, MT, … • Report from the E-assembly > SK • Report from QA team > DM, BF, XP, … • Summary ER development > FD, JD, … • Schedule > DG Flexibility nSQP Tecnical Meeting

  4. Technical Meetings Format • Progress chart of nSQPs nSQP Tecnical Meeting

  5. PRR Production Readiness Review (PRR) • The PRR attempts to verify that the production design, planning and the associated preparations for producing the system have in fact progressed to the point where a manufacturing commitment can be made without incurring unacceptable risk of breaching the established thresholds of cost, schedule and performance • Date: 7/2/12 9-16h in 60-6-015 • PRR committee shall tentatively be composed of: • Tobias Flick (chair) – IBL • JoernGrosse-Knetter- risk TF chair (ex-officio) • Daniela Macina – EN-MEF physicist • Andrea Catinaccio – PH-DT engineer nSQP Tecnical Meeting

  6. Documentation for Reviewers prior to PRR nSQP Tecnical Meeting

  7. PRR Base Agenda • General introduction, schedule • SPQ vsnSQPimprovements • Production flow (M & E aspects) • QA strategy from components to systems test • Connectivity • E-readout nSQP Tecnical Meeting

  8. B180 • Request additional space • Re-store ‘clean’ conditions • Cleaning of room • Arrange entrance • Put order in the different areas • Use protective clothing (coats and shoes) • Improve air quality • Set up area for soldering team (office in hall) nSQP Tecnical Meeting

  9. nSQP Tecnical Meeting