An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BCAL Status Report HPMT operation Readout geometry SciFi tests & analysis Prototype construction Zisis Papandreou, Regina November 1st, 2001

  2. Preliminary HPMT tests • DEP PP0350G • Discharging problem: partly solved • Pre-amp selection: partly solved • Signals observed from radioactivity source using a NaI detector • Direct communication with DEP established • Personnel: • Electronics engineer, technician, postdoc (Vitaly Kovaltchouk)

  3. HPMT Testing Chores • Need to perfect the electronic circuit • Fast charge pre-amp • Suitable pulse shaper • HV-rated cables • Communicate with DEP • Modify the detector design • Transfer knowledge • Bench tests • Operate with Flasher • Operate with Cosmic Rays

  4. HPMT Geometry (10 PMTs)? Tough-cookie design! Solution: DEP redesigns the electronics housing 10 HPMTs per side = 1000 PMTs ($2.5M)

  5. Readout & Geometry Issues • Optimize area reduction (4:1) • Light guides and Winston Cones • HPMTs must be staggered for clearance • No. of HPMTs must be settled • GUIDEIT MC simulations required • Fiber-to-fiber coupling & standard PMTs • VLPCs • Good neighbor policy: • Solenoid • Drift chambers

  6. SciFi Tests • First round of cosmic ray and TRIUMF tests completed;good results • Analysis: • Extract index of refraction • Improve timing resolution in software • Look at particle ID • Compare results with cosmic ray tests • Order Kuraray multi-clad fibers and test • Repeat cosmic-ray measurements • Begin prototype construction