A Comparative Analysis of SE to LSS (Lean Six Sigma)

A Comparative Analysis of SE to LSS (Lean Six Sigma). William “Bill” Fournier 15 May, 2012. Agenda. Abstract/Introduction Method Tools Thirteen LSS Tools Conclusions Future Research Footnotes . Abstract/Introduction. Abstract Introduction Lean and Six Sigma Lean Six Sigma

ankti
Download Presentation

A Comparative Analysis of SE to LSS (Lean Six Sigma)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Comparative Analysis of SE to LSS (Lean Six Sigma) William “Bill” Fournier 15 May, 2012

  2. Agenda • Abstract/Introduction • Method • Tools • Thirteen LSS Tools • Conclusions • Future Research • Footnotes

  3. Abstract/Introduction • Abstract • Introduction • Lean and Six Sigma • Lean • Six Sigma • Perspective • SEDC & DoD Track Tie • Recent Article

  4. Method • Comparative Analysis • INCOSE SE Handbook vs. ASQ and MIT LSS • Tools = Processes, Methods, or Techniques • Shared, Similar, Generic Tools

  5. Tools • Shared- QFD, IPDTs • Similar- TPM/Control Charts • Generic include many and non Technical- Statistical Tools

  6. Pareto’s Law / Poka Yoke/ RACI & LRC • Pareto’s Law • Concept- 80/20 • Usage- Prioritize Risk, Requirements, Verification, Trade studies • Poka Yoke • Concept- Design in for happy path • Usage- Detailed softwaredesign • RACI and LRC • Concept- Role clarity • Usage – SE planning

  7. Con. Res. Diag. / Error Proof./ Toyota • Conflict Resolution Diagram • Concept- Conflict • Usage- Trade studies • Error Proofing • Concept- Design out errors in process • Usage- Detailed design • Toyota Production System • Concept- Reduce waste • Usage – Flexibility

  8. Future Reality Diagram / LPI/ TOC • Future Reality Diagram • Concept- Planning for Change • Usage- Upgrades & Future Increments • LPI (Lean Performance Indicator) • Concept- Metrics for effectiveness • Usage- Incentives • TOC (Theory Of Constraints) • Concept- Resources for Logistics, Performance, and Logic • Usage- Trade studies

  9. Quick Change. / Kanban / Takt Time • Quick Changeover • Concept- Adaptable processes • Usage- Requirements and Design flexibility • Kanban • Concept- Just In Time • Usage- Design and Planning processes • Takt Time • Concept- Balance Process designs for schedule • Usage- Design and Planning process

  10. Perspective • Perspective • Concept- The Blind Men and The Elephant • Usage – Expanding Lessons Learned and synergy between disciplines

  11. Conclusion & Future Research • Conclusions • SE efforts improve use of 13 LSS Tools • SEs synergy by know the differences in terms & use • Future Research • Validate • Improve • Expand