An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Step 4: Project Implementation; Intro to Step 5: Project Operation & Maintenance Construction, Interconnection, and Commissioning Long-term Care of the Project

  2. 4 Implementation 5Operations & Maintenance 2 Options 4 Implementation 3 Refinement 1 Potential

  3. Step 4: Implementation • Purpose: Realize physical construction of project • Tasks: • Finalize preconstruction tasks • Realizeconstruction and equipment installation • Realizeinterconnection • Realize project commissioning leading to commercial operations • Output: Completed project (operation)

  4. Step 4: Implementation • Pre-construction • Project kickoff • Design and construction documents, plans/schedules, submittals • Construction of project • Contract oversight/quality control • Change control • Commissioning • Testing and verification • Interconnection verification (utility) Variable effort relative to project scale

  5. 1. Pre-construction • Checklists for schedules and each activity based on contract and project documents • Kickoff meeting • Utility interconnection process and agreement • Design (often in stages) and design approvals • Other possible plans: • Utility • Construction • Management • QC • Commissioning • Environmental Protection • Security

  6. 2. Construction of Project • Project developer orders equipment and begins construction or installation • Construction manager coordinates work of various trades • Close coordination with tenants if site is an occupied building • Frequent communication among all parties to minimize possible issues

  7. 4. Interconnection and Commissioning • Project interconnected according to utility interconnection agreement and utility process • Plan may be standardized by developer and technology and may be refined per individual system design • Witnessing and/or third party independent commissioning may be stipulated • Commissioning • Physical inspection • Testing • Whole system performance testing

  8. Step 4: Hypothetical – Outputs • Completed and operating project • New ownership organization completed (if needed) • Project Implementation Success • Project generating electricity • Project developed within budget Photo from Byers and Renier Construction, NREL 18221

  9. Project Risk – Post Step 4 Sources: Adapted from Holland & Hart, RE Project Development & Finance & Infocast, Advanced RE Project Finance & Analysis *NOTE: Underlining signifies that the risk assessment outcome changes during the step at hand.

  10. Project Development Process 5Operations & Maintenance 5Operations & Maintenance 2 Options 4 Implementation 3 Refinement 1 Potential

  11. Step 5: Operations & Maintenance (O&M) • Purpose: To ensure ongoing, effective project operation, i.e. energy production • Operational Costs: • Equipment maintenance and replacement • Monitoring • Insurance • Labor • Extended warranty agreements • If leasing, lessor often manages maintenance • If PPA, vendor typically manages maintenance • * Esp. if owner – role of highest O&M risk Photo from Florida Solar Energy Center, NREL 14728

  12. Post-Procurement: Project O&M • O&M agreements • Warranties • Monitoring and reporting system / services • Performance guarantees • Production guarantees • Buyout options