1 / 16

COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION

COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION . POWER PLANT 3 ph. Vs 1 ph. DATA COLLECTION EB TARIFF: Rs. 5.50/UNIT DIESEL : Rs.35/ LTR. POWER DISRUPTION: 12 HOURS PER DAY. EQUIPMENTS. R PHASE: 1.5 TR S/T AC UNITS- 1No

ama
Download Presentation

COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTSREMOTE SENSING IN BTS STATION

  2. POWER PLANT 3 ph. Vs 1 ph. DATA COLLECTION • EB TARIFF: Rs. 5.50/UNIT • DIESEL : Rs.35/ LTR. • POWER DISRUPTION: 12 HOURS PER DAY

  3. EQUIPMENTS • R PHASE: 1.5 TR S/T AC UNITS- 1No • Y PHASE : POWER PLANT- 35 A DC • B PHASE: LIGHT AND FANS • POWER PLANT: 150 A, SINGLE PHASE

  4. EA SET • 1No. 15 KVA 3PHASE • GIVEN WORKING LOAD OF 1NO AC UNIT AND 35 A DC CURRENT • AVERAGE DIESEL CONSUMPTION -1.65 LTR/HR.

  5. SINGLE PHASE POWER PLANT • AC VOLTAGE: 230, CURRENT: 10 A • DC VOLTAGE: 55 • DC CURRENT: 35 • EFFICIENCY: 55 X35 / 230 X 10 = 83%

  6. THREE PHASE POWER PLANT (200 AMPS) • AC VOLTAGE: 400 • AC INPUT CURRENT:5.5 AMPS • DC VOLTAGE: 55 • DC CURRENT: 35 • EFFICIENCY: 55 X35 / 400 X 5.5 = 87.5%

  7. ENERGY COST PER YEAR (EB) • 3.35 X 12 HOURS X 30 DAYS= 1206 kwh • 1206 x 5.5 = Rs.6633/- per month • Rs.79596/- per year

  8. EXPENDITURE ON EA SET • COST OF FUEL : Rs.35/ LTR • RUNNING HOURS : 12 HOUR/DAY • CONSUMPTION: 1.6 LTR /HOUR • EXPENDITURE PER MONTH: 1.6 X12 X 35 X 30 = Rs.20160 • EXPENDITURE = 2,41,920/- PER YEAR

  9. EXPENDITURE ON EA SET • COST OF PHASE SELECTOR SWITCH AND INSTALLATION CHARGE = Rs. 12,000/-

  10. EXPENDITURE ON EA SET • 12 HOURS WORKING PER DAY • FUEL CHARGES =Rs.2,41,920/- • EB CHARGES = RS. 79596/- • SAVING PER YEAR = Rs.241920 –( 79596+12000/-) =Rs.1,60,324/- • FUEL SAVING : RS.1,60,324/- PER YEAR.

  11. RECOMMENDATIONS • SINGLE PHASE POWER PLANT WITH PHASE CHANGER IS ECONOMICAL WHERE DISRUPTION OF ONE PHASE BY EB IN PRACTICE • EB METER CAPACITY SHALL BE 20AMPS PER PHASE • COST OF PHASE SELECTOR SWITCH CAN BE RETRIEVED WITHIN ONE MONTH

  12. RECOMMENDATIONS • THREE PHASE POWER PLANT IS ECONOMICAL IN URBAN AREAS WHERE CONTINUOUS 3PHASE POWER SUPPLY IS AVAILABLE.

  13. REMOTE SENSING IN BTS STATION - LOCATION • DB ROAD COIMBATORE • OTHER BTS STATION

  14. REMOTE SENSING IN BTS STATION • DB ROAD: PRESEVI MAKE SENSOR • FOLLOWING TRIP INDICATIONS EXTENDED TO TRICHY FROM COIMBATORE • AC FAILURE • LLOP • LOW FUEL • POWER PLANT TRIP • FIRE ALARM • DOOR OPEN • COST : 11000/-

  15. OTHER BTS STATION • FOLLOWING TRIP INDICATIONS EXTENDED • MAKE: PRESEVI • FIRE ALARM • ENGINE FAIL • EB SUPPLY FAIL • COST: 5000/-

  16. THANK YOU • EE COIMBATORE

More Related