Pricing Consultation Paper DNPC 01 Customer Charge Structure for the 0-73MWh Load Band

Pricing Consultation Paper DNPC 01 Customer Charge Structure for the 0-73MWh Load Band. Presentation on behalf of all DNs Lorraine Goodall - SGN. The Proposal. Change customer charge for 0-73MWh load band to capacity based Target Implementation date 1 April 07. Reasons for Proposal.

alodie
Download Presentation

Pricing Consultation Paper DNPC 01 Customer Charge Structure for the 0-73MWh Load Band

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pricing Consultation Paper DNPC 01Customer Charge Structure for the 0-73MWh Load Band • Presentation on behalf of all DNs • Lorraine Goodall - SGN

  2. The Proposal • Change customer charge for 0-73MWh load band to capacity based • Target Implementation date 1 April 07

  3. Reasons for Proposal • Improve cost reflectivity • Facilitate competition • Improve consistency

  4. Improve Cost Reflectivity • Costs reflected in the customer charges are: - Service pipe costs - Supply point emergency service costs These costs do not vary with throughput

  5. Facilitate Competition • Remove source of instability - Revenue sensitivity to volume - Change equalises sensitivity - No longer k variations due to weather

  6. Pricing The impact of volume variation on K Collectable £ revenue 65% gradient 35% gradient K over-recovery Allowed Income gained Income lost K under-recovery Warm/reduction 0 Cold/increase (Budgeteddemand)

  7. Price Control Review • Core Allowed Revenue fixed • Greater k variability

  8. Price Control Review The impact of volume variation on K 65% gradient £ revenue Collectable 0% gradient K over-recovery Proposed Collected Allowed K under-recovery Warm/reduction 0 Cold/increase (Budgeteddemand)

  9. Description of change • Remove existing 0-73MWh customer charge • New charge based on supply point SOQ • Ensure forecast revenue recovery neutral

  10. Implementation • Target date 1 April 2007 - Stable revenue flow from capacity charges - Seasonal revenue flow from commodity charges - Change required for formula year

  11. Summary - Reasons for Proposal • Improve cost reflectivity • Facilitate competition • Improve consistency

  12. Responses • Responses required by 30 October 2006