US LHC Accelerator Research Program. bnl - fnal- lbnl - slac. LARP Accelerator Systems: Progress Highlights and Goals of the Meeting. Vladimir Shiltsev. Events since Port Jeff. LTVAC formed at Port Jeff (10/25/06) Executive Committee (10/31/06) LTV lab-LARP parity, LARP focus on juniors
E N D
US LHC Accelerator Research Program bnl - fnal- lbnl - slac LARPAccelerator Systems:Progress Highlights and Goals of the Meeting Vladimir Shiltsev
Events since Port Jeff • LTVAC formed at Port Jeff (10/25/06) • Executive Committee (10/31/06) • LTV lab-LARP parity, LARP focus on juniors • US-CERN meeting (11/13/06): • PJAS status to LTV to be further investigated • 5-yr plan and new tasks prioritization • DoE mini-Review in Dec’06: • “… it is clear that LARP is developing exceedingly well, and its managers and membership should be congratulated for their outstanding progress and achievements” • FY’07 CR troubles (RHIC Run 7 off/on Mar’07) • FY’07 semi-annual report to DoE (03/25/07) LARP Collaboration Meeting
Accelerator Systems Budget 2304k$ out of 3611k$=64% half-way thru FY07 Instrum 77% Commiss 64% Collimat 54% Physics 48% LARP Collaboration Meeting
This meeting and beyond • At the meeting we are to hear (among all) about financial issues and needs of all the tasks • LARP AS contingency 200k$ - to be distributed after the meeting • Initial planning for FY’08 to take place at the meeting • Input on hard deliverable schedules • LTVAC, L2 tasks • New initiatives • To be finalized after the meeting • “gang of 5+1” • exec committee • DoE Review June 5-6 at FNAL LARP Collaboration Meeting
Instrumentation: Schottky 4 tanks installed at Point 4 of LHC, baked, vacuum tested Electronics shipped to CERN US team at CERN to commission in May LARP Collaboration Meeting
Instrumentation: Tune&Coupling FB Success at RHIC and Tevatron Success at SPS Apr’06 Oct’06 Oct’06: successful Final Design Review of at BNL Now: LHC system test at RHIC, Q’, later – LHC 450 GeV eng run LARP Collaboration Meeting
Instrumentation: Luminosity Monitors Two LUMINOSITY detectors under construction LUMI Prototype to be compared to RHIC ZDC Now: RHIC Run 7 with gold to test of complete system Later: integration at LHC LARP Collaboration Meeting
Collimation: Rotating Collimators Significant design improvement 200mm collimator brazed 200mm Cu mandrel w/ coil after brazing 960 mm Cu mandrel …will hear more progress at the meeting LARP Collaboration Meeting
wires (2.5m long) with strong-back (-profile)7 support points Physics: BBLR wires – ready for RHIC test 2 wires installed in RHIC Yellow and Blue rings Now: wire commissioning and experiments Code benchmarking LARP Collaboration Meeting
Commissioning • 5 hardware commissioners now at CERN • LTVAC identified / qualified LARP members from Accel Systems to spend >~3 mos. at LHC • All labs, incl. CERN, represented • All areas of Accel Sys represented • At the Collab Mtg: • Endorsements plans, remainder of FY07 • Provide recommendations (first pass) for travels in FY08 to L0/L1 • Visit LHC@FNAL (opened in Feb) ! LARP Collaboration Meeting
LHC@FNAL LARP Collaboration Meeting
LARP AS : Focus on Junior Physicists • They are active in all tasks: • Rama Calaga (Toohig Fellow), Mei Bai (Commiss.), Guillaume Robert-Demolaize (Collim. , 1/2 by RHIC), Natalia Prado de Abreu (Physics, 1/2 by RHIC), Yun Luo (Commiss) – at BNL • Ryoichi Miyamoto (AC dipole), Andreas Jansson (Schottky), H.J.Kim (IR), Arden Warner (Commiss) - at Fermilab • Jean-Francois Beche (Lumi) – at Berkeley • We are actively looking for new ones: • Toohig Fellows • 1 Research Associate for Lumi (Wainer Vandelli, Piza) • 1 RA for Rotating Collimator (Javier Resta Lopez) • 2 from SLAC to take part in commissioning LARP Collaboration Meeting
Collaboration/Coordination with CERN • Remarkable progress in 2006: • closer contacts established • “driving forces on both sides” model: • Luminosity monitors: A.RATTI and R.JONES • Schottky detectors: R.PASQUINELLI and F.CASPERS • Tune & Coupling FB: P.CAMERON and R.JONES • AC Dipole: S.KOPP and H.SCHMICKLER • HW Commissioning: M.LAMM and R.BAILEY • Beam Commissioning: M.SYPHERS and M.LAMONT • Collimation: T.MARKIEWICZ & R.ASSMANN LARP Collaboration Meeting
Collaboration with CERN in FY07 • Better coordination of all activities in FY07: • H.Schmickler/AB in LARP LTV Advisory Committee • O.Bruning/AB to be liaison to LARP IR,e-cloud work • J.P.Koutchouk/AT to be liaison to LARP beam-beam compensation projects (long-range & head-on lenses) • More collaborative work: • Even more visible LARP presence at CERN for • Installation and commissioning of LARP instruments • Participation in the next round of SPS studies • 2 more Hardware/IR Commissioners to come • First LARP Beam Commissioners - later in 2007 • Joint eCloud Clearing workshop @CERN (Mar’07) • Joint LHC beam-beam&IR workshop at SLAC, Jun’07 • Org’d by A.Chao & W.Fischer; to review experiments& simulations LARP Collaboration Meeting
FY07 AS Priorities & Goals • Lumi-Monitors: construct, install, start commissioning • Tune&Coupling FB: deliver design, participate in installation and commissioning • Schottky: participate in installation and commissioning • Hardware Commissioning: execute the plan (5-7 people) • Beam Commissioning: develop detailed Long Term Visitors TV plan for FY08+ by ~mid-FY07 • Other tasks: execute Task Sheet’s Plans • “5+1”: develop FY08 plan (incl. new tasks) by ~June’07 Hard Deliverable Hard Deliverable Hard Deliverable LARP Collaboration Meeting
This Meeting • This is “large” meeting to address: • Plan execution, achieved milestones, finances • Expected schedule/cost changes in FY07 • Plans for FY08 and beyond • It is the meeting to report/discuss • Technical achievements, in detail • Difficulties of any kind • Status of collaboration affairs (US labs, CERN) • Very important • Open discussion of new proposals (Thur PM) • Welcome new people joining us • from SLAC • from various Fermilab groups LARP Collaboration Meeting
New Initiatives • Collider Instrumentation • BBQ-based Quadrupole Monitor • Synch light based diagnostics • Physics • LHC Crystal Collimation Scheme • LHC Electron Lenses • Modeling of LLRF Limitations on LHC Performance • LHC Injectors • The Low-Energy Transverse Emittance Project • Super-Ferric Fast Cycling Injector in the SPS Tunnel • LHC injectors Upgrades, space-charge effects LARP Collaboration Meeting
Consideration Process • “Group of 5+1” to meet right after to recommend on support of proposals • General requirements: • Interesting subject, development should push up the state of the accelerator physics and technology in the US • Of interest for LHC • Collaboration of >1 Lab, Universities welcome • Not at expense of current unfinished tasks • Right time and budget scale • Final approval by LARP Executive Committee LARP Collaboration Meeting
Summary: • Remarkable progress since last LARP meeting: • Instrumentation tasks, Hardware commissioning • Rotating collimator design, Beam-beam wires, etc • Greatly improved LARP-CERN communication • Priorities in FY’07: • instrumentation tasks, • commissioning • LTV Advisory Committee started: • focus on junior researchers LARP Collaboration Meeting
Back up slides LARP Collaboration Meeting
AP: New Proposals vs Existing Tasks • Electron cloud (200k$/yr): • very high priority for the LHC, a lot of interest from US projects, now attacking e-p interaction simulations (new territory) • IR Optics and Beam-Beam Simulations (270k$/yr): • Making important contribution to LHC Upgrade work (12 talks in Valencia), plugs US into the LHC Upgrade consideration process as a pratner, develops software tools of particular importance for the LHC and generic importance for US colliders (beam-beam lifetime) • Beam-beam wires (150k$/yr): • Very positive development at CERN (there will be wires, space reserved), effective CERN-LARP collaboration, experiment at RHIC greatly enhances advanced accelerator R&D in the US, little funds after FY’07 LARP Collaboration Meeting
Instrumentation Tasks in FY’07 and FY’08 • Schottky & Luminosity Monitors, Tune Feedback : • Are or will be constructed and installed in FY07 • LARP will support their commissioning (via Commissioning task) in FY’07 and – in larger scale - in FY’08 (including 450 GeV run) • AC Dipole: • Just started, significant design progress expected in FY07 will determine funds needed in FY08 • Being discussed: • Longitudinal Density Monitors, Crab Cavities, ODR monitors • Funds in FY08 will depend on situation with higher priority tasks, e.g., commissioning of existing instruments (TBD after collaboration meeting in April’07) LARP Collaboration Meeting
New Physics Initiatives • Crystal Collimator (~50k$ 1st year): • waiting for Tevatron results with new bent crystal, not much encouragement from CERN, competes with Rotating Collimator for Phase II • Superferric LER or (S)PS (~100k$ 1st yr): • LER is “dead”, Super Ferric (S)PS+ m.b. considered later – depends on CERN plans, no strong inter-Lab team in the US • Hollow electron beam as proton/ion primary collimator (~50-100k$ 1st year): • Some interest at CERN, initial considerations to take place in FY07 technical considerations possible • Electron lens for beam-beam compensation (300 k$ 1st yr, ~600+ k$/yr x 4 yrs): • Preparatory theory work not done, some limited interest at CERN, working collaboration may be formed in FY07 • encouraging TEL results (doubles p-lifetime) • NB: before funding other things, we need complete current commitments (Instruments) as the highest priority LARP Collaboration Meeting
LHC Software at Fermilab (LAFS) • Motivation: make vast Tevatron accelerator controls experience available to the LHC operation team • Goal: to develop a suite of software products to enable Fermilab accelerator physicists to make key contributions to the beam commissioning of the LHC • A modest team (~3-5 FTE’s or 10 people) of computer professionals, operational experts, and accelerator physicists to make a substantial contribution to the LHC • LAFS is part of LHC@FNAL • Head – D.McGinnis – reports to E.Gottschalk • Three groups: • RBA (Role Based Access) – S.Gysin • Sequencer – J.Patrick • SDA – Sequenced Data Acquisition – E.McCrory • Collaborative agreement FNAL/CERN is signed by S.Holmes (last week) now at CERN • Relationship to LARP : • Complementary: • LARP input via LHC@FNAL Integration Task Force LHC subgroup LARP Collaboration Meeting