alexis
Uploaded by
15 SLIDES
313 VIEWS
150LIKES

Presentation summary

DESCRIPTION

Intel Corporation Group Reverse Osmosis Membrane Removal Tool Product Design Specification Team Members: Ron Groeger Jr. Chris Rogers Mike Neuwerth William Dilg. Presentation summary. Introduction Mission Statement Project Plan Customers Device Requirements House of Quality Gantt chart

1 / 15

Download Presentation

Presentation summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Intel Corporation GroupReverse Osmosis Membrane Removal ToolProduct Design SpecificationTeam Members:Ron Groeger Jr.Chris RogersMike NeuwerthWilliam Dilg

  2. Presentation summary • Introduction • Mission Statement • Project Plan • Customers • Device Requirements • House of Quality • Gantt chart • Conclusion • Questions

  3. Introduction • Intel corporation uses de-ionized water in the computer chip manufacturing process. • To remove particles and ions from the water, Intel uses reverse osmosis plants (RO’s) to perform this task. • Within each of these plants there are at least fourteen pressure vessels that each contain six reverse osmosis membranes connected in series by an interconnector • Two different membrane styles are used at Intel (Glegg (right), Code line (left)) Code line Glegg Several arrays of reverse osmosis plants

  4. Introduction Continued • Each membrane has a black chevron seal on one end. • These membranes are removed from the pressure vessels for maintenance. • The current procedure for removal of these membranes: • all six membranes are manually pushed with a piece of PVC pipe from one end by two people • A third person catches the membranes on the other end of the pressure correct • The current procedure is not safe or ergonomically correct RO membrane and interconnector

  5. Mission statement • To develop a tool to remove reverse osmosis membranes from the reverse osmosis plant pressure vessels. This tool needs to be compact, easy to use, robust, and have minimal impact on the time it takes to remove the reverse osmosis membranes. A working prototype is to be delivered to Intel by June of 2008.

  6. Project plan Specifics • Design tool that does not impact the current time by more than 25%. • The tool will improve the ergonomics and safety of the current membrane removal method. • The force required to remove the membranes will be tested. • The membrane removal tool will be tested after fabrication to establish if goals have been met • The cost shall be less than 7500$ • All reports, presentations, and prototype will be delivered on schedule.

  7. Customers • Internal: • ME 492/493 capstone course, • Faculty advisor • Individual member Intel 2008 capstone team • External: • Intel ultra pure water engineer • Intel facilities technicians

  8. Device requirements (Performance)

  9. Device requirements (Installation-Environment)

  10. Device requirements (Maintenance-Safety)

  11. Device requirements (Cost)

  12. House of Quality

  13. Gantt Chart

  14. Conclusion • The reverse osmosis membrane removal tool is a unique specialty tool • Main concerns of project: • Performance • Durability • Project engineering challenges: • Time constraints • Size constraints • Weight Constraints • The tool will: • Improve the safety and ergonomics of the removal of membrane. • Future possibilities: Our tool has the potential to be utilized by other companies besides Intel that use similar reverse osmosis plants for water purification.

  15. Questions?

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer