html5-img
1 / 1

BLIP Operations May 6-13, 2013

BLIP Operations May 6-13, 2013. Routine production of Sr-82 &Ge-68 continued at 117 MeV .

alessa
Download Presentation

BLIP Operations May 6-13, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLIP Operations May 6-13, 2013 • Routine production of Sr-82 &Ge-68 continued at 117 MeV. • Linac problems in mod 3&4 reduced beam on target to 153.8 hr. Intensity was good from Monday-Friday at ~ 102µA and then reduced to 75µA over the weekend with Ga target in place. Overall average was 91.9µA. • On May 8 a Linac test of 200 MeV beam was to be tried for ~5 hours. But interference with NSRL operations caused cancellation. • On May 20 we plan a 20 minute test at 66 MeV, then return to 117 MeV. • On May 21 or 22 we plan a 200 MeV test (~5hr) behind a daytime RHIC store if possible. • Operations in June and July will mostly be at 200 MeVfor Ac-225 research and irradiation of targets for LHC. • Operations at the Target Processing Lab (TPL) • Chemical separation of Ge-68 and Sr-82 ongoing. • Process of implementing long term corrective actions began.

More Related