lg e cane run station l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
LG&E - Cane Run Station PowerPoint Presentation
Download Presentation
LG&E - Cane Run Station

Loading in 2 Seconds...

play fullscreen
1 / 6

LG&E - Cane Run Station - PowerPoint PPT Presentation


  • 344 Views
  • Uploaded on

LG&E - Cane Run Station. Capacity: 610 MW 3 Units Burn: 1.5 MM TPY Receipts By: Rail and Barge ( via Riverport ) Quality: Moisture 12% Ash 12% SO2 6.2 BTU/# 11,000 . LG&E – Trimble County Station. Capacity: 547 MW 1 Units Burn:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'LG&E - Cane Run Station' - albert


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
lg e cane run station
LG&E - Cane Run Station
  • Capacity: 610 MW

3 Units

  • Burn:

1.5 MM TPY

  • Receipts By:

Rail and Barge (via Riverport)

  • Quality:

Moisture 12%

Ash 12%

SO2 6.2

BTU/# 11,000

lg e trimble county station
LG&E – Trimble County Station
  • Capacity: 547 MW

1 Units

  • Burn:

1.6 MM TPY

  • Receipts By:

Barge

  • Quality:

Moisture 15%

Ash 14%

SO2 6.5

BTU/# 11,000

lg e mill creek station
LG&E – Mill Creek Station
  • Capacity: 1,610 MW

4 Units

  • Burn:

4.4 MM TPY

  • Receipts By:

Rail and Barge

  • Quality:

Moisture 13%

Ash 14%

SO2 6.2

BTU/# 11,000

ku brown station
KU – Brown Station
  • Capacity: 755 MW

3 Units

  • Burn:

1.6 MM TPY

  • Receipts By:

Rail

  • Quality:

Moisture 10%

Ash 12%

SO2 2.75

BTU/# 12,000

Scrubber Units Scheduled To Be Online:

All Units- Spring 2009

ku ghent station
KU – Ghent Station
  • Capacity:2,189 MW

4 Units

  • Burn:

1.4 MM TPY High Sulfur

3.9 MM TPY Compliance

  • Receipts By:

Barge

  • Quality:

Unit #1 Unit #2,3,4

Moisture 10% 10%

Ash 12% 12%

SO2 6.25 1.2

BTU/# 11,000 12,000

Scrubber Units Scheduled To Be Online:

Unit 2- Spring 2007

Unit 3- Spring 2008

Unit 4- Spring 2009

ku green river and tyrone stations
KU – Green River and Tyrone Stations

Green River

  • Capacity: 175 MW

2 Units

  • Burn:

.350 MM TPY High Sulfur

  • Receipts By:

Truck

  • Quality:

Moisture 12%

Ash 12%

SO2 4.57

BTU/# 11,500

Tyrone

  • Capacity: 75 MW

1 Units

  • Burn:

.150 MM TPY High Sulfur

  • Receipts By:

Truck

  • Quality:

Moisture 8%

Ash 10%

SO2 1.8

BTU/# 12,000