Vassal: Loadable Scheduler Support for Multi-Policy Scheduling. George M. Candea, Oracle Corporation Michael B. Jones, Microsoft Research. The Problem. OS multiplexes CPU among tasks OS not always aware of scheduling requirements No algorithm is good enough for all task mixes
E N D
Vassal: Loadable Scheduler Support for Multi-Policy Scheduling George M. Candea, Oracle Corporation Michael B. Jones, Microsoft Research
The Problem • OS multiplexes CPU among tasks • OS not always aware of scheduling requirements • No algorithm is good enough for all task mixes • Compromise: Hardcode set of scheduling policies into the operating system • Desirable: Dynamically extensible set of policies
Overview of Vassal • Tasks can use custom scheduling policies • Custom schedulers • are special Windows NT drivers • coexist with the Windows NT scheduler • have negligible impact on global performance • In current prototype, one external scheduler loaded at once
Outline Motivation and Overview Windows NT Scheduling Vassal Design and Implementation Sample Scheduler Results Conclusions
Windows NT Scheduling • Schedulable unit = thread • Priority-based thread scheduling • Two policies, in distinct priority ranges: • Variable (dynamic priority round-robin) • Real-Time (fixed priority round-robin)
NT Scheduling Precedence 1. Interrupts 2. Deferred Procedure Calls (DPCs) 3. Threads • Not all time gets scheduled based on priorities • Scheduling predictability is limited
NT Scheduling Events • Scheduling decisions triggered by: • End of thread quantum • Priority or affinity changes • Transition to Wait state • Wakeups
Windows NT Timers • Hardware Abstraction Layer (HAL) provides kernel with a periodic timer • Resolution selectable from 1 to 15 ms (default: 10 or 15 ms) • Not all HALs implement all values • MP HAL provides 1, 2, 4, 8, 16 ms • Some HALs just implement 10 ms
Outline Motivation and Overview Windows NT Scheduling Vassal Design and Implementation Sample Scheduler Results Conclusions
Separate Policy from Mechanism • NT scheduler = thread dispatcher with scheduling policies interspersed • Vassal = separate scheduling and dispatching modules • Schedulers: policy modules that decide which threads to run • Dispatcher: runs threads selected by schedulers
Details of Present Prototype • Standard NT policies remain in kernel • Schedulers are in a hierarchy • Give loaded scheduler first choice • Ask native scheduler if loaded scheduler makes no choice • Could easily support deeper hierarchy • By default, threads use NT policies
Vassal Entities • Schedulers • Register decision making routines with dispatcher • Dispatcher • Invokes decision routines when scheduling events occur • Threads • Communicate with schedulers to request services
Application Thread User space NT Scheduler External Scheduler Thread Dispatcher Kernel Vassal Architecture Hardware Abstraction Layer (HAL) Drivers
Interface Modifications • Extend driver interface for schedulers: • RegisterScheduler • SetSchedulerEvent • Extend syscall interface for threads • MessageToScheduler
Registering a Scheduler RegisterScheduler (scheduler identifier, decision making routine, message dispatcher routine) • Invoked by driver at initialization time • Dispatcher checks for conflicts and updates scheduler hierarchy • Dispatcher queries scheduler by invoking the decision making routine
Communicating with a Scheduler MessageToScheduler (scheduler identifier, message buffer, message length) • Thread sends message to specific scheduler • Corresponding scheduler’s message dispatcher extracts message from buffer and responds
Precisely Timed Events SetSchedulerEvent (scheduler identifier, absolute time value) • Scheduler requests control of CPU at certain absolute time • Dispatcher invokes scheduler’s decision routine at specified time
NT Scheduler Vassal Interfaces Application Thread User space MessageToScheduler External Scheduler Thread Dispatcher RegisterScheduler Kernel SetSchedulerEvent Hardware Abstraction Layer (HAL) Drivers
Outline Motivation and Overview Windows NT Scheduling Vassal Design and Implementation Sample Scheduler Results Conclusions
Sample Real-Time Scheduler • Allows threads to get scheduled at application-specified time instances • Demonstrates potential for more interesting time-based policies
Using The Real-Time Scheduler Tell system to use the real-time scheduler status = MessageToScheduler (RT_scheduler, {JOIN}) if status != SUCCESS error (“Could not join R/T scheduling class.”) We want one iteration every 1ms while TRUE do { status = MessageToScheduler (RT_scheduler, {SET, wakeup_time}) … wakeup_time = wakeup_time + 1 msec }
RUN WAIT RUN Thread Join R/T scheduling class Set time constraint Event occurred Kernel Dispatch thread Request thread Make scheduling decision Scheduler Update datastructures Update data structures Set precisely timed event predicted Execution of Sample Code T
Outline Motivation and Overview Windows NT Scheduling Vassal Design and Implementation Sample Scheduler Results Conclusions
Windows NT Kernel Changes • Added 188 lines of C code • Added 61 assembly instructions • Replaced 6 assembly instructions
Context Switch Times Context switch times on original and modified systems (µs, P-133) • No significant difference when external schedulers not loaded • 8% overhead on untuned prototype when using loaded schedulers
Writing a Scheduler • Proof-of-concept real-time scheduler: • 116 lines of C code • No assembly language • Only need to code the policy
Periodic Wakeup Times Wakeup times using multimedia timers on vanilla system and sample scheduler on Vassal (µs, P-133). Desired value is 1000. • No early wakeups when using our scheduler • Predictability significantly improved • Believe late samples due to unscheduled activities
Outline Motivation and Overview Windows NT Scheduling Vassal Design and Implementation Sample Scheduler Results Conclusions
Vassal Take-Home • Demonstrates viability and effectiveness of loadable schedulers • Frees OS from anticipating all possible application scheduling requirements • Encourages scheduling research by making it easy to develop and test new policies • Insignificant performance impact
Limitations and Future Work • Timing precision limited by HAL • Predictability limited by interrupts and DPC activity • Only one loaded scheduler supported • External schedulers not fully MP aware
Related Work • Solaris scheduler class drivers • Must map scheduling decisions onto global thread priority space • Extensible OS work • Spin, Exokernel, Vino • Hierarchical schedulers • Utah CPU inheritance scheduling • UIUC Windows NT soft real-time scheduler
For More Information... • http://pdos.lcs.mit.edu/~candea/research.html • http://research.microsoft.com/~mbj/