An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis of Load and Calculated Available Wind Power using Data from the Bonneville Power Administration DemetriosBovopoulos West High School ‘12 Emmanuel Gyebison West High School ‘13 Jacob Armstrong West High School ‘13 Young Scholar’s Program July 17, 2012 Knoxville, Tennessee

  2. Matlab • MATLAB was used to analyze the data, which was from a Bonneville Power Administration (BPA) meteorological site in Oregon. • Matlab provides: • The ability to perform loops • Intuitive function names • The ability to read and write Excel files • A program was written to • Get the data • Calculate the power using a model taken from http://www.stanford.edu/group/efmh/winds/aj07_jamc.pdf for a GE 1.5 MW turbine

  3. Use of MATLAB • Calculate the capacity factor and average per-turbine output • Compare this output to the load

  4. The wind power and the load

  5. Data Analysis • Our data showed that the wind is highest at night • The wind speed was lowest around noon. • Some of our data proved that the lower the temperature, the better the wind output.

  6. Using a turbine to model the wind data • We used a 1.5 MW GE turbine as our model • It would take 8879 wind turbines to generate as much energy as was consumed by the load. The cost of this would be $12 billion • 200 turbines would provide 2.25% of the loadat a cost of $260 million • The capacity factor is 45.47% – very high for a wind farm. • The average load is 6.0555 GW over the time period in question.

  7. Why Wind is the Future • Wind shows potential to be the answer. It looks promising as a alternative source of power. • The wind is forever free • Unlike fossil fuel power stations, wind turbines do not produce harmful emissions. • By dispersing wind farms, a certain percentage of the total energy output can be used for base-load power generation.

  8. Offshore wind power provides continuous reliable power Wind can be integrated easily with the grid because most of the energy from a wind turbine is already in the form of 60Hz AC As height increases, wind becomes steadier

  9. Cons and misconceptions of wind • The wind doesn’t blow all the time at any given site. • The speed of the wind is constantly changing. • Some people think its too noisy.

  10. Do wind turbines kill birds?

  11. Not in significant numbers!

  12. Not in my back yard • People do not want wind turbines near their houses • BUT… • Most wind sites are in sparsely populated areas • Some of the land is occupied by farmers, but wind turbines do NOT prevent the growth of crops on the land • Leasing the right to place wind turbines on the land would be an option.

  13. Our Proposal • Wind would do very little for a city like Knoxville. • So we found a place that is such that wind could provide most of its energy

  14. Santa Barbara • Population 90,000 • It is located between a mountain and an ocean • Both are great places for wind turbines.

  15. Santa Barbara has a power demand of about 30MW and a peak demand of 50 MW. • So what we are proposing is that (10) 6 MW offshore wind turbines be put in place and (20) 2MW wind turbines be put on the mountain • The overall cost would be around $150 million

  16. This plan could be used for small towns all around the USA that are close to the ocean and mountains. • Over time the savings in electricity would repay the cost of building wind farms.

  17. http://science.howstuffworks.com/environmental/green-science/wind-turbine-kill-birds.htmhttp://science.howstuffworks.com/environmental/green-science/wind-turbine-kill-birds.htm • http://www.energy.siemens.com/us/en/power-generation/renewables/wind-power/?stc=usccc025486 • http://transmission.bpa.gov/business/operations/wind/ • http://www.sce.com/ • http://www.stanford.edu/group/efmh/winds/aj07_jamc.pdf