1 / 1

Description: Floor Grid has a gap issue that is causing –M parts to be order every AP

Floor Grid Pre-fabricate –M fittings. Responsible: Helms/Johnson Approved by: S. Przybelinski Date: 8/1/2012. GTG: . Y. G. Is / Was. Description: Floor Grid has a gap issue that is causing –M parts to be order every AP Ordering 3-4 –M parts per AP and AP 60 saw 10 –M parts

adlai
Download Presentation

Description: Floor Grid has a gap issue that is causing –M parts to be order every AP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Floor Grid Pre-fabricate –M fittings Responsible: Helms/Johnson Approved by: S. Przybelinski Date: 8/1/2012 GTG: Y G Is / Was • Description: • Floor Grid has a gap issue that is causing –M parts to be order every AP • Ordering 3-4 –M parts per AP and AP 60 saw 10 –M parts • Ordering Special Ti Fitting and Special Bushes, as the dimension is different each AP and each part is link to a EPD that calls out the unique dimensions • Closure Criteria: • Part(s) defined (Complete 3/26) • Parts on dock   Applicability: -9 -10 -8 Line no. Target : 90 Status: Reasons: Perform. Cost Maint. Produce. Rate Supplier / Partner Focal: N. Norman/K. Helms Originating Organization: ME   Anticipated Benefits: Customer:________Program__ Weight reduction:______N/A__ Labor hrs reduction:____TBD_ Cr path reduction:_____12 hr__ BOEING PROPRIETARY ECCN 9E991

More Related