slide1
Download
Skip this Video
Download Presentation
Michael Sabbaghian Flood Projects Office Division of Flood Management

Loading in 2 Seconds...

play fullscreen
1 / 17

Michael Sabbaghian Flood Projects Office Division of Flood Management - PowerPoint PPT Presentation


  • 208 Views
  • Uploaded on

Flood Projects Office & Central Valley Flood Protection Board January 11, 2010. Michael Sabbaghian Flood Projects Office Division of Flood Management Department of Water Resources. 2. FPO & CVFPB. FPO & CVFPB. New Relationship – 2007 Legislation Memorandum of Agreement – December 2008

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Michael Sabbaghian Flood Projects Office Division of Flood Management' - adin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
Flood Projects Office

&

Central Valley Flood Protection Board

January 11, 2010

Michael SabbaghianFlood Projects Office

Division of Flood Management

Department of Water Resources

2

slide3
FPO & CVFPB
  • New Relationship – 2007 Legislation
  • Memorandum of Agreement – December 2008
  • FPO Chief – Principal Contact for Board Staff
  • FPO GF Funding for Board Activities – Approx. $500,000
  • FPO Staff – Staff to Board for Projects (PMs for Studies & Projects)
  • State-federal Studies & Projects – Require Board Action

4

federal state and local roles
Federal, State, and Local Roles

USACE: Fed partner, traditional designer/constructor of State-federal facilities; modifications need federal approval

CVFPB: Lead non-federal sponsor with USACE for flood protection projects in the Sacramento-San Joaquin Valley

DWR: Project manager for State-federal studies and projects for the Board; provide policy and technical expertise; administers fund and grant programs to repair and improve State-federal facilities and local levees

LMA’s: Owner of local levees; maintains local and State-federal project levees; repair and improve State-federal facilities and local levees

slide9
USACE Feasibility – National Economic Development (NED) Plan
  • Identified as an alternative in all studies
  • Uses the Annual Net Benefits
  • Determines Federal cost share limit
  • Recommended plan-NED/Locally Preferred Plan (LPP)

LPP

$5 mil

100% sponsor

NED

$10 mil

65/35

NED

$10 mil

65/35

$6.5mil Fed

$3.5mil sponsor

$6.5mil Fed

$8.5mil sponsor

slide10
USACE 3x3x3 Feasibility Study Directive
  • No more than 3 years to prepare a Chief’s Report
  • Not cost more than $3 million, which includes federal and non-federal cost
  • No more than 3 levels of review
  • All documentation to fit in a 3” binder
  • Reduce the number of federal studies nationally by 1/3
slide11
USACE-CVFPB Active Studies
  • American River Common Features GRR
  • Lower Cache Creek
  • Lower San Joaquin
  • Sutter Basin
  • West Sacramento GRR
  • Yuba Basin GRR
slide12
USACE-CVFPB Current Projects
  • American River Common Features
  • Folsom Joint Federal Project (JFP)
  • Folsom Raise (authorized but no PPA yet)
  • Marysville Ring Levee
  • Mid Valley (authorized but no appropriation)
  • Middle Creek (authorized but no appropriation)
  • Natomas (not yet authorized)
  • West Sacramento (finished in 2012)
  • South Sacramento Streams
slide13
Active Studies

&

Current Projects

slide14
Water Code Citations
  • 12580 – Studies
  • 12582.7 – Projects
  • 12585.7 – Project Cost Sharing
  • 12585.12 – Ecosystem Projects
  • 12642 – Operations & Maintenance, and Hold Harmless
  • 12643 – Indemnify and Hold Harmless State
  • 12750 – Small Project Participation
slide15
USACE-DWR/Board Relationship
  • Coordination – Studies & Projects
  • Meetings at various Levels (PRB, Executive Management, PDT, etc.)
  • Quarterly Information & Request for Funding
  • Congressional Appropriation – Close Coordination of $ Request
  • New USACE Planning Modernization (3x3x3) Feasibility Process
  • Joint Training Sessions
slide16
USACE Challenges
  • Sponsor / Partner
  • Administration - (ASA(CW), OMB)
  • Congress - Committees, Members
  • Realistic Cost Estimates & Schedules
  • Land, Easement, Right-of-way, Relocation, Disposal area (LERRDs)
  • Perform as promised
  • Policy Development

HQ

Division

District

Project

ad