Manufacturing Resource Planning MRPII. 生產資源規劃. Manufacturing Resource Planning MRPII. Distribution Forecasting, Sales order processing, Inventory Control, Purchase order processing Manufacturing
Manufacturing Resource Planning MRPII
E N D
Presentation Transcript
Manufacturing Resource Planning MRPII • Distribution • Forecasting, Sales order processing, Inventory Control, Purchase order processing • Manufacturing • Master production Scheduling (MPS), Rough-cut Capacity Planning (RCCP), Material Requirement Planning (MRP), Work Order Processing (WOP), Shop Floor Control (SFC), Capacity Requirement Planning (CRP), Bill of Material (BOM), Routing. • Financial • Sales ledger, Purchase ledger, General ledger, Fixed assets.
Distribution配送 • Forecasting需求預測 • Sales order processing客戶訂單處理 • Inventory Control存貨控制 • Purchase order processing採購訂單處理
Manufacturing製造 Master production Scheduling (MPS)主生產排程 Rough-cut Capacity Planning (RCCP)產能規劃 Material Requirement Planning (MRP) 物料需求規劃 Work Order Processing (WOP)工單處理 Shop Floor Control (SFC)現場控制 Capacity Requirement Planning (CRP), Bill of Material (BOM)產品結構/物料零件表 Routing.
財務 • Sales ledger • Purchase ledger • General ledger • Fixed assets. 採購 會計 財務分析
MRP是ERP的引擎 • MRP可用來規劃所有資源的未來需求. • 主生產排程(MPS)記錄完成品的生產計畫, 驅動各項資源的需求. • 材料表(BOM)人力表(BOL)定義完成品與材料或人力的關係. 資源表(BOR)定義BOM中各零件與所需設備產能的關係. • MRP利用BOM將MPS轉成未來各期的材料需求,其中的自製零件再透過BOL及BOR轉成人力及設備需求. 其中,人力及設備需求亦使用相同的MRP邏輯. • 利用MPS中的完成品總需求及MRP中的採購/外包零件計畫, 可算出未來各期的資金需求.