Micropiles Save Drilled Shafts

Micropiles Save Drilled Shafts. Allen Cadden, P.E. Problem. Settlement of up to 25 to 50 mm Cracks in supported floors Work stopped before last 2 floors were constructed. Subsurface Conditions. New Fill. Alluvial Soils. Residual Soils. Partially Weathered Rock. 10-40 ft. 3-12 m.

adelie
Download Presentation

Micropiles Save Drilled Shafts

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Micropiles Save Drilled Shafts Allen Cadden, P.E.

  2. Problem • Settlement of up to 25 to 50 mm • Cracks in supported floors • Work stopped before last 2 floors were constructed

  3. Subsurface Conditions New Fill Alluvial Soils Residual Soils Partially Weathered Rock 10-40 ft 3-12 m Diabase Rock

  4. Instrumented Load Test

  5. Strain Gauge Configuration 7 inch, N80 0.5 inch wall 178 mm, 12.5 mm wall 56 kg/mm2 Steel 10 ft (3 m) Segment 1 Strain Gauge 10.9 ft 2 13.9 ft 3 14.4 ft (4.4 m) 16.9 ft 4 23.4 ft

  6. 9 mm 1070 kN 2140 kN 3210 kN Load Test Results

  7. 1070 kN 2140 kN 7.4 m

  8. Average Shear Stress vs. Cycle @ 300 ton (2700 kN)(assumes nonmoving pile tip) 1150 kPa, 165 psi

  9. Caisson Connection to Drilled Shafts High Load, Large Shaft

  10. Connection to Drilled Shafts Low Load, Small Shaft

  11. Micropile Caps for Caisson Repair

  12. Conclusions • Micropiles fixed the problem • Loads well in excess of 300 tons can be carried by a 7 inch pile • The load transfer in a rock socket is not constant under cyclic loading