1 / 40

Integration Studies at Points 7, 1 & 5 Available Space and Possibilities

Integration Studies at Points 7, 1 & 5 Available Space and Possibilities. Jean-Pierre Corso - CERN 14 th November 2012. 2 nd HiLumi LHC-LARP Frascati. EDMS No 1249553. Outline. LHC Quick Overview Links at Point 7 (DFBA) Links at Point 1 (DFBX) Links at Point 5 (DFBX).

adah
Download Presentation

Integration Studies at Points 7, 1 & 5 Available Space and Possibilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integration Studies at Points 7, 1 & 5Available Space and Possibilities Jean-Pierre Corso - CERN 14th November 2012 2ndHiLumi LHC-LARP Frascati EDMS No 1249553

  2. Outline • LHC Quick Overview • Links at Point 7 (DFBA) • Links at Point 1 (DFBX) • Links at Point 5 (DFBX) 2nd HiLumi LHC-LARP Frascati

  3. LHC Quick Overview Point 7 Point 5 Point 1 2nd HiLumi LHC-LARP Frascati

  4. Links at Point 7 • Situation of the area • Limitations • Available space for HiLumi 2nd HiLumi LHC-LARP Frascati

  5. Situation of Point 7 IP7 2nd HiLumi LHC-LARP Frascati

  6. Situation of Point 7 191m Shaft PM76 LHC TZ76 LHC LHC LHC 2nd HiLumi LHC-LARP Frascati

  7. Limitations of Point 7 • PM76 lift access • 1000kg max. • 900 x 1950 x 2500 (w,d,h) • Tunnel access • Width: 1050mm into TZ76 • Height: 2020 into UJ76 • 3 chicanes to pass into UJ76 !!! LHC Tunnel UJ76 TZ76 2nd HiLumi LHC-LARP Frascati

  8. Bottle Neck UJ76  TZ76 2nd HiLumi LHC-LARP Frascati

  9. Bottle Neck UJ76  TZ76 UJ76 • Cables, Pipes coming from: • Surface towards UJ76 & Tunnel (2 sides) • Tunnel (2 sides) towards TZ76 • UJ76 towards TZ76 • And back… • Tunnel Ventilation • 2 wind collectors 1250 • 1 smoke extraction duct • 1 input duct TZ76 2nd HiLumi LHC-LARP Frascati

  10. Bottle Neck UJ76  TZ76 (view from TZ76) 1 2 3 4 2nd HiLumi LHC-LARP Frascati

  11. Links HiLumi Integration 2nd HiLumi LHC-LARP Frascati

  12. Links HiLumi Integration RR77 R771 R771 2nd HiLumi LHC-LARP Frascati

  13. Links HiLumi Integration R771 UJ76 UJ76 UJ76 R771 R771 2nd HiLumi LHC-LARP Frascati

  14. Links HiLumi Integration UJ76 TZ76 UJ76 TZ76 UJ76 R771 R771 2nd HiLumi LHC-LARP Frascati

  15. TZ76 Links HiLumi Integration UJ76 TZ76 UJ76 PM76 TZ76 PM76 UJ76 2nd HiLumi LHC-LARP Frascati

  16. To Summarize Point 7… • Positive • 180 m available in the TZ76 • 1080x2800 section along those 180m • Challenging • Equipments must come from the tunnel • Then, towards UJ76 and existing TZ76 No More than 600x1600x2500 ! 2nd HiLumi LHC-LARP Frascati

  17. Something like that… 2nd HiLumi LHC-LARP Frascati

  18. Links at Point 1 • Overview of the area • HiLumi Link routing 2nd HiLumi LHC-LARP Frascati

  19. Point 1 Surface Shaft PM15 2nd HiLumi LHC-LARP Frascati

  20. Point 1 Surface & Underground Shaft PM15 DFBX DFBX 2nd HiLumi LHC-LARP Frascati

  21. UJ14 Equipments in place IP1 UJ14 Q3 DFBX Warm D1 UJ13 2nd HiLumi LHC-LARP Frascati

  22. UJ14 Equipments in place All the equipment should be installed in a new surface building. IP1 UJ14 IP1 2nd HiLumi LHC-LARP Frascati

  23. UJ14 Routing link into UJ14 UJ14 IP1 New SC link should be installed to connect underground equipment machine and surface electrical equipment. Q2 RB14 2nd HiLumi LHC-LARP Frascati

  24. UL14 Equipments in place SC linkcouldpass in thisgallery. UL14 1st Floor UL14 Ground Floor 2nd HiLumi LHC-LARP Frascati

  25. US15-PM15 Routing link into US15/PM15 The two SC links pass in the shaft PM15. One from right side One fromleftside. top US15 UL16 UL14 2nd HiLumi LHC-LARP Frascati

  26. Point 1 Surface Shaft PM15 2nd HiLumi LHC-LARP Frascati

  27. SD1 Routing link into SD1 A waywillbefound for the two SC link. PM15 Door… 2nd HiLumi LHC-LARP Frascati

  28. SD1 Equipments at Surface 2nd HiLumi LHC-LARP Frascati

  29. SD1 Equipments at Surface All the equipmentsmovedfrom UJ14 and UJ16 shouldbeinstalled in this new surface building. 2nd HiLumi LHC-LARP Frascati

  30. Links at Point 5 • Overview of the area • HiLumi Link routing 2nd HiLumi LHC-LARP Frascati

  31. Point 5 Surface Shaft PM56 2nd HiLumi LHC-LARP Frascati

  32. Point 5 Surface & Underground DFBX DFBX Shaft PM56 2nd HiLumi LHC-LARP Frascati

  33. RZ54 Equipmentsin place Left Side IP5 2nd HiLumi LHC-LARP Frascati

  34. RZ54 Routing link Left Side New shaft for SC Link Height ~85 meter 2nd HiLumi LHC-LARP Frascati

  35. RZ54 Routing link Left Side Some equipment should be installed in a new surface building. See next slide. 2nd HiLumi LHC-LARP Frascati

  36. RZ54 Point 5 Surface New Building Shaft PM56 Shaft PM54 2nd HiLumi LHC-LARP Frascati

  37. UJ56 Equipments in place Right Side IP5 DFBX UJ56 Warm D1 Q3 IP5 UJ57 2nd HiLumi LHC-LARP Frascati

  38. UJ56 Equipments in place Way for SC Link from surface to underground shouldbestudied. Someequipmentsshouldbe installed in a new surface building. No spacefoundyet. 2nd HiLumi LHC-LARP Frascati

  39. RZ54 Point 5 Surface New Building * Somewhere, still to befound… Shaft PM56 Shaft PM54 2nd HiLumi LHC-LARP Frascati

  40. Thanks for your Attention ! 14th November 2012 EDMS No 1249553