dtw snow study l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
DTW SNOW STUDY PowerPoint Presentation
Download Presentation
DTW SNOW STUDY

Loading in 2 Seconds...

play fullscreen
1 / 5

DTW SNOW STUDY - PowerPoint PPT Presentation


  • 316 Views
  • Uploaded on

DTW SNOW STUDY. PLANNING FOR THE FUTURE. DTW SNOW STUDY. What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events?

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'DTW SNOW STUDY' - Sophia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
dtw snow study

DTW SNOW STUDY

PLANNING FOR THE FUTURE

dtw snow study2
DTW SNOW STUDY
  • What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events?
  • Today’s economy demands that all facets of the aviation industry develop a collaborative approach to safely maximizing opportunities.
dtw snow study3
DTW SNOW STUDY
  • THE PLANS:
    • EQUIPMENT
    • MANPOWER
    • FACILITIES
    • OPERATIONS
    • FINANCIAL
equipment plan
EQUIPMENT PLAN
  • RUNWAY TEAM

11 High Speed Multi-Function Plows

6 High Speed Large Capacity Blowers

2 Conventional Runway Plows

3 Sand Trucks

2 De-icer Tankers

TOTAL RUNWAY EQUIPMENT: 24 Pieces

  • TAXIWAY TEAM

4 High Speed Multi-Function Plows

4 High Speed Large Capacity Blowers

4 Conventional Runway Plows or Brooms

2 Sand Trucks

1 De-icer Tanker

TOTAL TAXIWAY EQUIPMENT: 15 Pieces

  • TOTAL EQUIPMENT NEEDED: 39 Pieces