1 / 9

LOD_in_BIM_Collaboration_Final (1)

Explore the role of LOD in BIM services and how it supports error reduction, better coordination, and efficient project execution.<br>

Smartcadd
Download Presentation

LOD_in_BIM_Collaboration_Final (1)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LOD in BIM Services: Reducing Errors and Improving Collaboration by SmartCADD Read full blog

  2. What Is LOD in BIM? • LOD (Level of Development) is a measure of accuracy and reliability in BIM components. • Sets clear expectations and improves communication across teams. • Explore our BIM Services

  3. The Benefits of LOD • Reduces errors and rework • Enhances collaboration among architects, engineers, and contractors

  4. LOD 100-500 Overview • LOD 100 - Conceptual (basic massing) • LOD 200 - Schematic (approximate systems) • LOD 300 - Detailed (construction-ready geometry) • LOD 350 - Coordinated (clash detection) • LOD 400 - Fabrication (shop-drawing detail) • LOD 500 - As-built (verified for facility management)

  5. Clarifying LOD vs. Level of Detail • LOD (Development): Reliability and usability of data • LOD (Detail): Visual and geometric detail

  6. Collaboration & Error Reduction • Brings a common framework to align stakeholder expectations • Streamlined coordination • Fewer misunderstandings • Lower risk of rework

  7. Implementation Best Practices • Clearly define LOD requirements in BEPs/contracts • Adopt LOD gradually through project phases • Use BIM execution plans • Avoid over-modeling early

  8. Summary • LOD improves BIM workflows by enhancing clarity, reducing conflicts, and supporting coordinated design and construction

  9. Get in touch • SmartCADD - CAD and BIM Services • Website: https://www.smartcadd.com/ • Email: info@smartcadd.com • Phone: +61 415 567 801 • Read full blog: LOD in BIM Service: Reducing Errors and Improving Collaboration

More Related