FOUNDATIONAL PROJECTS BY 2020 345kV or Greater. NTTG NTTG01 –Gateway South Phase 1 NTTG02 – Gateway Central Phase 1 NTTG03 – Gateway West Phase 1 NTTG05 – Hemingway – Boardman NTTG06 – Cascade Crossing NTTG07- Mountain States Intertie CG CG01 – I-5 Corridor CG02- West McNary BCTC

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Draft Document - Ver. 4.0, April 21, 2010' - Rita


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

FOUNDATIONAL PROJECTS BY 2020

345kV or Greater

  • NTTG
  • NTTG01 –Gateway South Phase 1
  • NTTG02 – Gateway Central Phase 1
  • NTTG03 – Gateway West Phase 1
  • NTTG05 – Hemingway – Boardman
  • NTTG06 – Cascade Crossing
  • NTTG07- Mountain States Intertie
  • CG
  • CG01 – I-5 Corridor
  • CG02- West McNary
  • BCTC
  • BCTC01- Nicola – Meridian
  • Alberta AESO
  • AESO03 1202L Conversion
  • AESO04 Heartland
  • AESO05 West HVDC
  • AESO06 East HVDC
  • AESO07 Fort McMurray - East Line
  • AESO08 Fort McMurray - West Line
  • CAISO
  • CAISO02- Sunrise
  • CAISO03- Bythe-Devers
  • SSPG
  • SSPG01- SWIP
  • SSPG03- SNIP (Phase 2)
  • SSPG06 –Harry Allen - Northwest
  • SSPG07 – Northwest – Armagosa
  • SSPG09 – SWIP South
  • SWAT
  • SWAT01-PV-NG#2
  • SWAT06- Pinal Central – Tortolita
  • SWAT07- Southeast Valley (SEV)
  • SWAT08 – PV - Morgan
  • CCPG
  • CCPG02 – Pawnee – Smoky Hill
  • CCPG03 – Waterton- Midway
  • CCPG04 – San Luis Valley

Alberta

AESO07

AESO08

Heartland

AESO03

AESO04

AESO06

Ellerslie

Genesee

AESO05

Langdon

Nicola

West Brooks

Meridian

BCTC01

Washington

Castle Rock

Townsend

CG02

CG01

Troutdale

Montana

McNary

Coyote

Spgs

John Day

Bethel

NTTG07

NTTG06

NTTG05

Boardman

Idaho

Oregon

Hemingway

Midpoint

Wyoming

Windstar

NTTG03

Populus

Aeolus

NTTG03

Bridger

NTTG02

NTTG01

Terminal

SSPG01

Pawnee

Oquirrh

CCPG02

Limber

Nevada

Mona

Smoky Hill

Waterton

NTTG01

CCPG03

Sigurd

Midway

Internal reinforcements projects not shown for clarity

California

Legend

Utah

Colorado

Red Butte

Amargosa

SLV

Comanche

SSPG06

500 kV Single Circuit Line

345 kV Single Circuit Line

500 kV Double Circuit Line

345 kV Double Circuit Line

DC Circuit (various voltage)

Termination Substations

Intermediate Substations

CCPG04

SSPG07

Harry Allen

Northwest

SSPG03

Eldorado

Arizona

Morgan

SWAT08

Devers

Blythe

CAISO03

Browning

New Mexico

SWAT07

SWAT01

Peňesquitos

Imperial

CAISO02

Palo Verde

Pinal Central

North Gila II

SWAT06

Tortolita

Draft Document - Ver. 4.0, April 21, 2010

(1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List.

(2) Internal reinforcements projects not shown for clarity.

(3) Lines shown are for illustrative purposes only and may not reflect final line routing.

slide2

POTENTIAL PROJECTS BY 2020

345kV or Greater

  • NTTG
  • NTTG01 –Gateway South Phase 2
  • NTTG02 – Gateway Central Phase 2
  • NTTG03 – Gateway West Phase 2
  • NTTG04 – Hemingway-Captain Jack
  • NTTG08 – Chinook
  • NTTG09 – Zephyr
  • NTTG10 – Overland
  • NTTG11 – Transwest Express
  • CG
  • CG01 – SeaBreeze
  • BCTC
  • BCTC02- CNC
  • Alberta ESO
  • AESO02- Northern Lights
  • CAISO
  • CAISO01- C3ET
  • SSPG
  • SSPG04 – Harry Allen – Mead (line #2)
  • SSPG05 – Mead- Eldorado
  • SSPG08- Blackhawk - Armagosa
  • SWAT
  • SWAT02-PV-Colo. River
  • SWAT03- Navajo Transmission Project
  • SWAT04- SunZia
  • SWAT05- High Plains Express (South)
  • CCPG
  • CCPG01 – WCI
  • CCPG05 – Lamar Front Range
  • CCPG07 – Pawnee Daniels Park
  • CCPG08 – Pawnee – Story

Edmonton

Calgary

Selkirk

AESO02

BCTC02

Washington

Townsend

Montana

Buckley

CG03

Oregon

Idaho

Hemmingway

Midpoint

Captain Jack

Wyoming

Windstar

Populus

NTTG04

NTTG10

Aeolus

NTTG03

Bridger

SWAT05

LRS

Terminal

CCPG 08

Nevada

NTTG01

CCPG 01

BCTC02

NTTG02

Wray

Limber

Pawnee

NTTG08

NTTG11

CCPG 07

NTTG09

Blackhawk

Mona

Story

Daniels Park

SSPG08

Sigurd

CCPG05

Missile Site

Internal reinforcements projects not shown for clarity

NTTG01

California

Colorado

Boone

Comanche

Collinsville

Amargosa

Red Butte

Lamar

Utah

Gregg

Legend

Vilas

Harry Allen

Crystal

Red Mesa

CAISO01

Gladstone

500 kV Single Circuit Line

345 kV Single Circuit Line

500 kV Double Circuit Line

345 kV Double Circuit Line

DC Circuit (various voltage)

Termination Substations

Intermediate Substations

Mead

Shiprock

Marketplace

New Mexico

SWAT03

Moenkopi

Midway

Eldorado

Arizona

Springerville

Blackwater

Corona

Colo. River

SWAT02

SunZia East

SWAT05

Palo Verde

Pinal Central

SunZia Midpoint

SWAT04

Draft Document - Ver. 4.0, April 21, 2010

(1) Map does not reflect 230kV lines that are included in the Foundational Transmission Project List.

(2) Internal reinforcements projects not shown for clarity.

(3) Lines shown are for illustrative purposes only and may not reflect final line routing.