Discover which products are most profitable. product mix or expansion decisions Help set prices. Value product inventory

3. Chapter. Why Assign Costs to Products?. System Design: Job-Order Costing. Discover which products are most profitable. product mix or expansion decisions Help set prices. Value product inventory. reporting; insurance Identify inefficiencies or non-value added costs. Allocating Costs.

Pat_Xavi
Download Presentation

Discover which products are most profitable. product mix or expansion decisions Help set prices. Value product inventory

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3 Chapter Why Assign Costs to Products? System Design: Job-Order Costing • Discover which products are most profitable. • product mix or expansion decisions • Help set prices. • Value product inventory. • reporting; insurance • Identify inefficiencies or non-value added costs.

  2. Allocating Costs Costs that cannot easily be traced to a particular product. Indirect Costs Pooled together and allocated using cost driver. Product / Service Traced to a particular product or service. Direct Costs

  3. Job Costing Challenges of job costing • Allocating the manufacturing overhead costs. • ABC = elaborate method of dividing costs • Keeping track of individual jobs.

  4. Process Costing WIP FG Challenge of process costing • Splitting the total cost between WIP and FG.

  5. Recording Transactions B. xxx Materials B. 10 B. 4 B. 0 a b Purchase materials Raw materials used Prob 3-18, p.131

  6. B. xxx B. xxx WIP MOH Control B. 4 (b) 120 (b) 20 Cash c d Payroll Insurance

  7. B. xxx WIP MOH Control B. 4 (b) 120 (c) 90 Cash B. xxx e f g Factory utilities Advertising Depreciation on equipment (b) 20 (c) 60 (d) 13

  8. WIP MOH Control (b) 20 (c) 60 (d) 13 (e) 10 (g) 20 B. B. 4 (b) 120 (c) 90 h Allocated OH (£2.2 per mh) i Goods completed and transferred

  9. Finished Goods B. 8 (i) 310 B. xxx j j Sales revenue Cost of goods sold

  10. MOH Control CGS (b) 20 (c) 60 (d) 13 (e) 10 (g) 20 (j) 308 k To close overhead accts (h) 110 0

  11. Inventory Accounts Materials WIP Finished Goods B. 10 (a) 160 B. 4 (b) 120 (c) 90 (h) 110 B. 8 (i) 310 (b) 140 (i) 310 (j) 308

  12. Disposing of Over / Underapplied Overhead Adjusted Allocation Rate • Calculate actual indirect cost rate. • Recompute allocation of costs to each job. Prorate Based on Indirect Costs Allocated • Determine how much overhead, allocated in the current period, is in WIP, FG and CGS. • Prorate the over- or under-applied overhead based on these amounts.

  13. WIP FG CGS Old costs £ 12 Current costs DM £ 5 £ 4 £ 111 DL 4 3 83 OH 5 3 102 Total £ 14 £ 10 £ 308 WIP FG CGS

  14. MOH Control WIP Finished Goods CGS (b) 20 (c) 60 (d) 13 (e) 10 (g) 20 B. 10 (b) 120 (c) 90 (h) 110 B. 8 (i) 310 (j) 308 (i) 310 (j) 308 k To close overhead accts (h) 110