EPCPROMAN is a EPC Planning and EPC Construction Management Software widely used in disciplines like Piping, Civil, Structural, Electrical and Instrumentation, Equipment to manage the project functions like Engineering / Ordering / Tendering / Manufacturing and Delivery / Construction / Commissioning where these disciplines and functions are managing by the agencies such as Piping and Steel Fabricators, EPC and LSTK contractors, Owners and Operators, PMCu2019s involved in jobs related with Offshore / Onshore Petrochemicals, Ship Building, Oil and Gas Refineries, Power Plants, Breweries, Renewable
E N D
Project Planning and Control Software Solutions (Engineering, Procurement, Costing, Material Control at Site, Monitoring/Reporting, Analysis etc.) - Complete Project Control (DFR, FEED, Engineering, Procurement, Construction, Cost Control & Risk Mgmt. ) - Item codification creation / standardization / mapping of engineering and procurement item codes, converting commodity code to unique item code Engineering Procurement Construction ESTIMATION Steel Fabrication & Erection Pipe Spooling, Joints / Welds Estimation ,Costing & Bidding Piping Isometric made easy Material Control Tracking from Engineering to Procurement to Construction at store or site/yard. Simplify Engineering Construction Piping Spooling operations for the convenience of erection work. fabrication & Estimation, costing & bidding for a project based on basic and preliminary documents. Related history of cost and generation documentation. Making Isometric Spool materials and reporting from outline of specification driven, rule based. automatic drawings, drawings, Piping Piping Bill the of Civil Quantities, Bar Bending Solution isometric, of bidding Spool fabrication activities, Material Management STORE / warehouse Management Organized Inventory with flawless Material Tracking Connection, Civil, BBS, Plate Optimization etc. Equipment Erection, Nozzles & lines Connections. Erection Management & Control Estimation / initial Material Take-Off “Right Material in Right Place at Right Time”. Material Planning, Expedition, analysis, Storage, issue, reconciliation. Ensure Efficiency in Plant Construction SPOOLMAN ERMAN ® is a piping spool, material and construction management software at shop / site useful for effective matching front analysis, work allocation, material allocation, piping material controls- and tracking. Management Steel Connection Design as per Indian Standard, Quantities estimation, Bending solution etc. Estimate P&IDs Layouts. MTO and based Equipment on Cost, Civil Bar Barcode, Installation Cable Sheduling Spool Status BarCode / RFID Precommissioning / Commissioning ** EPCPROMAN is widely used in disciplines like Piping Civil Structural E & I Equipment Pipeline EPCPROMAN has been widely used by: PIPING / STEEL Fabricators, EPC Contractors, LSTK Contractors, Owners & Operators, PMC for all jobs related with Upstream Offshore & Onshore, Petrochemical, Oil & Gas Refineries, Power Plants, Ship Building, Breweries, Renewable Energies or any plant which include Concrete, Structural Steel, Piping, Electrical & Instrumentation works. ** Should be purchase separately. www.parascadd.com; www.eurekadsoft.com; www.myappent.com
MY APP Enterprise MY APPENT MYAPP Enterprise is a web based software designed for each and every activity in the office starting from time sheet, employee information, application tracking, internal office communication etc. MYAPP consist of various modules and each of the these modules can work independently or can be integrated with each other. Option is available for purchasing individual module/s or combined MYAPP ENTERPRISE. Following are MY APPENT modules: Project Control & Risk Management Office Automation solution Customer Relationship Management Pipeline projects Document Management Financial Planning HSE Project Challenge Optimization Estimation Costing & Bidding 2D/3D Design Application Project cost control health safety And environment For more information and details kindly follow the link https://www.myappent.com Copyright © 2015 PARASCADD Pvt. Ltd.
Track N Tracing-BARCODE-RFID -- -- -- -- GENERATION OF SPOOL AND ERECTION COMPONENT BARCODES BARCODE PRINTER PASTING OF BARCODE STICKERS ON SPOOLS AND ERECTION COMPONENTS -- CREATION OF SPOOLS SENT TO LAYDOWN REPORTS -- -- RECEIVE SPOOLS AND ERECTION COMPONENTS AT LAYDOWN BY SCANNING THE BARCODE WITH SCANNER HAND DEVICES WITH BARCODE,DATE AND TIME OF SCANNING CAPTURED AUTOMATICALLY -- STORAGE OF SPOOLS AT GRID AND CAPTURE BOTH GRID LOCATION BARCODE AND SPOOL AND ERECTION COMPONENT BARCODE DISPATCH ISSUE OF SPOOLS AND ERECTION COMPONENTS FROM STORAGE GRID TO SITE BY SCANNING THE BARCODES. DATE, TIME, GRID LOCATION CAPTURED AUTOMATICALLY -- -- CREATION OF SPOOL AND ERECTION COMPONENT DISPATCH VOUCHERS -- RECEIPT OF SPOOLS AND ERECTION COMPONENTS AT SITE BY SCANNING THE RESPECTIVE BARCODES (APPLICABLE AS PER AVAILABILITY OF SITE BARCODE SCANNING FACILITY) Copyright © 2015 PARASCADD Pvt. Ltd.
RFID Based Location tracking Spool Tracking, Spool Search Generate RFID TAG ID for each spool data Attach the RFID TAG on the spool Store the spool at desired laydown area Go to laydown with hand held RFID Reader (Scan Range up to 4 to 15 meter) Scan hard RFID tag applied on assets by RFID reader Key-In location information / Scan grid RFID tag containing grid location data Software will update that information of assets to a database system Asset information can be found by login into the system Repeat above process if asset gets relocate RFID TAG GENERATION FOR SPOOL : Copyright © 2015 PARASCADD Pvt. Ltd.
RFID Based Location tracking UHF LAYDOWN AREA 1 HAND HELD RFID READER Copyright © 2015 PARASCADD Pvt. Ltd.
LIVE PROGRESS UPDATION USING ANDROID, IOS, WINDOWS CUTTING BARCODE GANERATION CUTTING CLEARANCE FIELD/SHOP WARE HOUSE FITUP WELDING FIELD SHOP HEAT NO. CLEARANCE KITTING CLEARANCE NDT HMIV SPOOLSTATUS CUT/KIT PWHTOFF. PWHT WELDING FITUP NDT OFFER DMR HI OFF. HI MPT RT ERECTION LOFTING Copyright © 2015 PARASCADD Pvt. Ltd.
CAP- Construction Automation Partner Services Efficient Project Control To PMC/EPCM/OWNER Operators to help them in achieving complete control & automation in the construction projects by implementing EPCPROMAN – software solution package for Project Control, Management, Progress Automation, Tracking & Risk Management This service is being duly implemented by us for providing a complete solution to the client projects with using EPCPROMAN software This service includes deploying trained manpower on the job to have complete control Service includes the facility of providing required operating machines to our clients with proper hardware specifications on rental basis for achieving desired results on time With the help of our efficient software and trained manpower, client can get proper exposure on their projects with seamless communication and co-ordination with guaranteed results Manpower can be provided depending on the project scope & duration associate as a with the CONSTRUCTION AUTOMATION PARTNER Material Management, Construction Advantage : On - Job implementation with trained manpower Project handling by Expert team members Instant support with dedicated backend support team Team exposure with multi-Project environment International project exposure Seamless communication and coordination Better control & resolution Copyright © 2015 PARASCADD Pvt. Ltd.
DES-DETAILED ENGINEERING SERVICES PROCESS Intelligent PID Services All Services In 2D & 3D Platform Database Administration/Customization Services Piping Study/MTO preparation Plot Plan & Equipment Layouts / Isometrics preparation Piping Support Selection/MTO estimation Piping Stress Analysis using Caesar PIPING DISCIPLINES Control Loop Configuration Instrument Schedule and Material take off Instrument Schedules and datasheet preparation Cable tray layout presentation ELECTRICAL & INSTRUMENTATION Structural Steel detailing Connection Design Steel Fabrication CIVIL & STRUCTURAL Detailing of heat transfer equipments Design calculations, engineering specifications and drawings as per codes MECHANICAL For more details contact : PARASCADD Private Limited Mumbai ( Head Office): Kushal Point, Fourth Road, Ghatkopar West, Mumbai-400086. Ph. : 0091-22-21015100/25111-111/25111-222 Email : amit@parascadd.com; sales@parascadd.com Website: www.parascadd.com, www.eurekadsoft.com,www.myappent.com